Franklin Farms Project is a natural gas pipeline lateral in Louisiana, operated by ETC Tiger Pipeline, LLC.
| Franklin Farms Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | Proposed[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Richland[2] |
| Announced | November 2025[4] |
| FERC docket | CP26-549[1] |
| Technical information | |
| Pipe size | 20", 36"[2] |
| Capacity | 1,000,000 Dth/d of capacity on the new Franklin Farms Lateral[2] |
| Capacity added | 250,000 Dth/d of firm transportation service mainline capacity[2] |
| Cost | approximately $137,388,622 (Exhibit K estimate)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Franklin Farms Project is a natural gas pipeline lateral in Louisiana, operated by ETC Tiger Pipeline, LLC.
Spreads
| Spread |
|---|
| Single spread[3] |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Franklin Farms Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-549”. Federal Energy Regulatory Commission. 1 July 2026. Retrieved 3 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Franklin Farms Project (CP26-549)”. Federal Energy Regulatory Commission. 25 August 2026. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Franklin Farms Project (CP26-549), Volume I”. ETC Tiger Pipeline, LLC (filed with FERC). 1 July 2026. Retrieved 3 October 2026.
- “Energy Transfer, Entergy Louisiana Ink 20-Year Gas Deal to Power North Louisiana Growth”. Pipeline & Gas Journal. 5 November 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.