Troy Construction
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Troy Construction is a pipeline contractor based in Houston, Texas.
| Troy Construction | |
|---|---|
| Legal name | Troy Construction, LLC[1] |
| General information | |
| Industry | |
| Status | Active[5][6] |
| Headquarters | Houston, Texas, US[4][6] |
| Regions | AZ,CO,NM,UT,WY, OK,TX, Mexico, IL,IA,KS,MO,NE, IN,MI,OH, AL,AR,LA,MS,TN, FL,GA,SC,PR,VI, KY,NC,VA,WV[3] |
| Website | www.troyconstruction.com[3] or www.thetroycompanies.com[6][sources disagree] |
| PLCA | Not a PLCA member as of 3 October 2026[7] |
| On ProvenHand | |
| Hands listed | 0 |
Troy Construction is a pipeline contractor based in Houston, Texas.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| Port Arthur Pipeline Louisiana Connector[2] | Prime | General contractor, 72-mile 42-inch pipeline | 2024–2026 | ||
| Blackcomb Pipeline[8] | Prime | Spread 4: 190 km of 42-inch, wall 15.6 to 22.5 mm, X-70 (RMS project list) | Spread 4 | 2025 | |
| CP Express Pipeline Project Phase 1[8] | Prime | Spread 1: 77 km of 48-inch, wall 25.4 to 36.6 mm, X-70 (RMS project list) | Spread 1 | 2025 | |
| Louisiana XPress Project[9] | Prime | LAXP: Alexandria compressor station gas coolers (Columbia Gulf Transmission, Alexandria, LA) | 2022 | ||
| Topside Meter Station[9] | Prime | Replace 8/10-inch meter and regulator stations with three new stations, six skids, yard piping, headers and valves (Knoxville, TN) | 2022 | ||
| Enterprise Gillis Lateral[10] | Prime | Listed as the Acadian to Gillis Lateral: 83.2 miles of 30-inch; the page lists the location as DeRidder, LA | 2021 | ||
| Leidy South Project[9] | Prime | Station 607 (Sweet Valley, PA): greenfield station with two 22,490 HP Solar Titan 130 turbine units | 2021 | ||
| Permian Highway Pipeline[10] | Prime | Spread 1: 112 miles of 42-inch | Spread 1 | 2021 | |
| Permian Highway Pipeline[10] | Prime | Spread 5: 86 miles of 42-inch | Spread 5 | 2021 | |
| Transco Southeastern Trail Expansion[9] | Prime | Compressor Station 175 horsepower addition (Scottsville, VA): one 22,490 HP Solar Titan 130 unit | 2020–2021 | ||
| Transco Southeastern Trail Expansion[9] | Prime | Station 115 reversal (Newnan, GA): piping and yard valves for bi-directional flow (page lists it as Station 115 Reversal; Transco) | 2020–2021 | ||
| Transco Southeastern Trail Expansion[9] | Prime | Listed as SET Station 125 and Station 135 Deodorization (Monroe, GA and Belton, SC): deodorization vessels, canisters and piping (Transco) | 2020–2021 | ||
| Whistler Pipeline[10] | Prime | 82 miles of 42-inch and 50 miles of 36-inch; the page lists the location as Crane, TX | 2020–2021 | ||
| Whistler Pipeline[10] | Prime | 82 miles of 42-inch and 50 miles of 36-inch, location Crane, Texas (per Troy's page; client WhiteWater Midstream) | 2020–2021 | ||
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James)[10][11] | Prime | Spreads 1 and 2: 106.5 miles of 24-inch; the page lists the location as Lake Charles, LA | 2018–2019 | ||
| Grand Prix NGL Pipeline[10] | Prime | Grand Prix South Spread 1: 79 miles of 30-inch | Spread 1 | 2019 | |
| Grand Prix NGL Pipeline[10] | Prime | Grand Prix South Spread 2: 77 miles of 30-inch | Spread 2 | 2019 | |
| Grand Prix NGL Pipeline[10] | Prime | Grand Prix South Spread 3: 77 miles of 30-inch | Spread 3 | 2019 | |
| Grand Prix NGL Pipeline[10] | Prime | Grand Prix South Spread 4: 42 miles of 30-inch | Spread 4 | 2019 | |
| Gulf Coast Express Pipeline[10] | Prime | Spread 1: 42.8 miles of 36-inch (Midland, TX) and 82.2 miles of 42-inch (Crane, TX) | Spread 1 | 2019 | |
| Gulf Coast Express Pipeline[12] | Prime | Industrial Info (July 2018) lists Troy on the estimated $650 million Spread 2 of the Gulf Coast Express, 180 miles from Rankin to Del Rio, and on an estimated $250 million 50-mile lateral from Midland to Rankin, TX | 2019 | ||
| Gulf Connector Expansion[12] | Prime | General contractor for two new compressor stations (Station 23 near Victoria and Station 32 near Wharton) and modifications to Station 30 in El Campo; construction began early 2018, completion expected in the first quarter of 2019 | from 1 January 2018 | 2018–2019 | |
| Broad Run Expansion Project[12] | compressor station work; the article says the project involves Troy without stating the role | At work (July 2018) on Kinder Morgan's compressor station in Clay City, Kentucky, supporting the Broad Run Expansion Project (200 MMscf/d) | 2017–2018 | ||
| Gulf Coast Expansion Project[12] | compressor station work; the article says the project involves Troy without stating the role | Named on Kinder Morgan's Gulf Coast Southbound Expansion Project: the new Compressor Station 394 near Linden and modifications to Station 301 in Wharton, expected complete in the fourth quarter of 2018 | 2018 | ||
| Pomelo Connector Pipeline[10] | Prime | 13 miles of 30-inch; the page lists the location as Robstown, TX | 2018 | ||
| Project Wildcat[13] | Prime | Listed 2018 as contractor: 140 miles of 20-, 24- and 30-inch | 2018 | ||
| Virginia Southside Expansion Project II[14] | Prime | Listed 2017 as contractor: 4 miles of new 24-inch and a meter station, Brunswick to Greensville County, VA | 2017 | ||
| Eagle Ford Dos Hermanas Pipeline[15] | Prime | Listed as Energy Transfer, 50 miles of 24-inch (Dos Hermanas); the page lists the location as Catarina, TX | 2011 | ||
| Aethon Interconnects[9] | Prime | Bland Lake interconnect, Index 99 interconnect heater and regulator modifications, Magasco piping modifications (Jasper and Pineland, TX; listed as Boardwalk Pipeline Partners Gulf South) | |||
| CS 309 Reversal[9] | Prime | Piping, valves and instrumentation for bi-directional compression, four gas coolers, three filter separators, pig-trap modifications (Marble Hill, MO) | |||
| Cameron Highway Pipeline - Texas City Route[16] | Prime | Listed as Cameron Highway Pipeline - 24-inch Texas City Route under the page heading 2004 Projects (Partial) | |||
| Compressor Station 23[12] | Prime | General contractor for the new Station 23 near Victoria, TX (Gulf Connector expansion); completion expected first quarter 2019 | from 1 January 2018 | ||
| Compressor Station 32[12] | Prime | General contractor for the new Station 32 near Wharton, TX (Gulf Connector expansion); completion expected first quarter 2019 | from 1 January 2018 | ||
| Compressor Station 394[12] | compressor station work; the article says the project involves Troy without stating the role | Named on the new Compressor Station 394 near Linden, TX, which connects with Cheniere's Corpus Christi Pipeline; expected complete in the fourth quarter of 2018 | |||
| Epic Rose[10] | Prime | 20 miles of 16-inch including 1,800 feet of horizontal directional drills; the page lists the location as Midland, TX | |||
| Fairburn Compressor Station[12] | compressor station work; the article says the project involves Troy without stating the role | At work (July 2018) on Kinder Morgan's compressor station in Fairburn, Georgia (343 MMscf/d, Fulton County to Fayette County) | |||
| Gardendal to Three Rivers[17] | Prime | Pipeline construction photo posts: Plains All American — Gardendal to Three Rivers (spelled as the page spells it) | |||
| Line 434 Project[18] | Prime | Listed 2018-2019 as contractor: 35 miles of 30-inch near Laurinburg, NC | |||
| Mentone Residue and Gathering Pipelines[10] | Prime | 57 miles of 6-inch to 36-inch pipe (five pipelines); the page lists the location as Kermit, TX | |||
| Muskogee Pipeline[18] | Prime | Listed 2018-2019 as a pipeline construction contractor (with R&R Pipeline and Troy) | |||
| Mustang Replacement[10] | Prime | 22.3 miles of 36-inch (replacing and relay); the page lists the location as Victoria, TX | |||
| Odessa to Stanton[10] | Prime | 43 miles of 20-inch; the page lists the location as Midland, TX | |||
| Pony Express Expansion Newkirk Station[19] | Prime | Facility construction photo post: Tallgrass Energy Partners — Pony Express Expansion Newkirk Station | |||
| Praha Compressor Station[9] | Prime | Two 30,000 HP Solar Titan 250E compressor packages with filter separators, six-bay gas cooler and associated civil and mechanical work (Moulton, TX; listed as Kinder Morgan PHP) | |||
| SK Pipeline[10] | Prime | 30 miles of 36-inch; the page lists the location as Angleton, TX | |||
| Sardis Compressor Station Replacement[9] | Prime | 31,000 HP: two Solar Mars 100 units with gas coolers, filter separators, buildings and auxiliary systems (Panola, MS) | |||
| Seabrook Logistics Pipeline[13] | Prime | Listed March 2018 (through 2019) as the pipeline construction contractor: 13 miles of 24-inch bi-directional pipeline, Seabrook, TX | |||
| Seabrook Logistics Pipeline[11] | Prime | Listed (February 2019 list) as the pipeline construction contractor: 13 miles of 24-inch bi-directional pipeline, Seabrook, TX | |||
| Station 803 Modification Phase 2[9] | Prime | Instrumentation and electrical work, new headers and bypass piping, foundations and supports (Mount Pleasant, TX; listed as Kinder Morgan NGPL) | |||
| Sterling Pump Station[19] | Prime | Facility construction photo posts: Tallgrass Energy Partners — Sterling Pump Station | |||
| Sweeny Hub Phase 2[9] | Prime | Packages 1 and 2: pumps, meter stations, pig traps, buildings and steel structures at four stations (Sweeny, TX; client listed as Phillips 66 Sweeny - Freeport 2PL) | |||
| Tennessee Gas Pipeline - Compressor Station 303A[15] | Prime | Listed as El Paso - Tennessee Gas Pipeline - Compressor Station 303A (Cranberry, PA) | |||
| Tennessee Gas Pipeline - Compressor Station 310[15] | Prime | Listed as El Paso - Tennessee Gas Pipeline - Compressor Station 310 (Clermont, PA) | |||
| Thomaston Compressor Station[20] | Prime | Facility construction photo posts: Kinder Morgan — Thomaston Compressor Station | |||
| Transco - AGL Highpoint[9] | Prime | Hot tap on the Dalton Lateral, AGL High Point meter station with ultrasonic meter runs, filter separator and RTU (Douglas, GA) | |||
| Transco - Compressor Station 135[15] | Prime | Listed as Williams / Transco - Compressor Station 135 (Anderson, SC) | |||
| Trident Intrastate Pipeline[8] | Prime | Spread 2 and the Golden Triangle Lateral: 181 km of 42-inch, wall 15.2 to 21.9 mm, X-70 (RMS project list) | Spread 2 | ||
| Webb Compressor Station Modifications & Blackwell Regulator Station[9] | Prime | Engine and off-skid piping modifications, slug catchers, regulator skids and electrical work at Webb, plus Blackwell regulator installation (Grant County and Kay County, OK) | |||
| Welda Station Upgrades 2019[9] | Prime | Flow control and measurement upgrades at the Welda storage field and filter separators at the Welda compressor station (Welda, KS) |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread |
|---|---|
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James) | Spread 1[11] |
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James) | Spread 2[11] |
| Blackcomb Pipeline | Spread 4[8] |
| CP Express Pipeline Project Phase 1 | Spread 1[8] |
| Grand Prix NGL Pipeline | Spread 1[10] |
| Grand Prix NGL Pipeline | Spread 2[10] |
| Grand Prix NGL Pipeline | Spread 3[10] |
| Grand Prix NGL Pipeline | Spread 4[10] |
| Gulf Coast Express Pipeline | Spread 1[10] |
| Permian Highway Pipeline | Spread 1[10] |
| Permian Highway Pipeline | Spread 5[10] |
| Trident Intrastate Pipeline | Spread 2[8] |
| Whistler Pipeline | Spread 1[21] |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
References
- “Contribution and Transfer Agreement dated September 1, 2014 (Exhibit 10.1 to Tallgrass Energy Partners 8-K)”. Tallgrass Energy Partners, LP (filed with the SEC). 8 September 2014. Retrieved 6 October 2026.
- “Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings”. Underground Infrastructure (written by HDR staff). December 2025. Retrieved 3 October 2026.
- “APCA member directory entry: Troy Construction, LLC”. American Pipeline Contractors Association. Retrieved 3 October 2026.
- “Troy Construction, LLC home page”. Troy Construction, LLC. Retrieved 3 October 2026.
- “About Us - Houston Pipeline Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
- “Troy Capabilities Overview: Integrated Service Offerings (April 2023)”. Troy (The Troy Companies). April 2023. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
- “Facility Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
- “Pipeline Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
- “Troy Construction Takes On More than $1 Billion in Natural Gas Pipeline Projects”. Industrial Info Resources. 13 July 2018. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- “.:: ~ Troyconstruction - Safety”. Troy Construction. Archived from the original on 4 February 2013. Retrieved 3 October 2026.
- “2002 Pipe Projects”. Troy Construction. Archived from the original on 13 June 2008. Retrieved 3 October 2026.
- “Pipeline Construction posts (Troy Construction site, June 2021 capture)”. Troy Construction. Archived from the original on 18 June 2021. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
- “Facility Construction posts, page 2 (Troy Construction site, August 2021 capture)”. Troy Construction. Archived from the original on 4 August 2021. Retrieved 6 October 2026.
- “News (Troy Construction site, August 2020 capture)”. Troy Construction. Archived from the original on 5 August 2020. Retrieved 6 October 2026.
- “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.