Permian Highway Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Permian Highway Pipeline is a natural gas pipeline in Texas, operated by Kinder Morgan Energy Partners. It entered service in 2021. It runs 430 miles.

Permian Highway Pipeline
General information
KindPipeline project[1]
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Facility project
StateTexas[1]
Announced25 June 2018[3]
In serviceJanuary 2021[1][4]
Contractors
Technical information
Length430 mi[1]
Capacity2100 MMcf/d additional capacity (EIA)[1] or capacity of approximately 2.1 Bcf/d[4][sources disagree]
Costapproximately $2 billion (2018 estimate at announcement)[3]
On ProvenHand
Hands listed0

Permian Highway Pipeline is a natural gas pipeline in Texas, operated by Kinder Morgan Energy Partners. It entered service in 2021. It runs 430 miles.

Contractorsedit

ContractorWorkScopeSpread
Troy Construction[5]PrimeSpread 1: 112 miles of 42-inchSpread 1
Troy Construction[5]PrimeSpread 5: 86 miles of 42-inchSpread 5
Pumpco, Inc.[6]Prime165 miles of 42-inch for Kinder Morgan, Big Lake, TX to Fredericksburg, TX (year listed 2021); rock ditch project, nine-month construction duration
MasTec, Inc.[7]Pipeline construction contracts (role not stated in source)Various construction contracts for pipeline activities on Permian Highway Pipeline (Oil and Gas segment)
RMS Welding Systems[8]Mechanized weldingMOWII mechanized welding, 105 km of 42-inch line (wall 15.2, 18.3 and 21.9 mm), listed with MPG Pipeline Contractors
MPG Pipeline Contractors, LLC[8]Pipeline contractor for 105 km of 42-inch line (named on RMS Welding Systems' project list; prime or sub not stated)105 km of 42-inch pipe welded with RMS mechanized system
SWCA Environmental Consultants[9]Environmental services (scope not stated)Listed by SWCA as related project: Permian Highway Pipeline Environmental Services, multiple counties, Texas

Pipe mills

Spreads

SpreadPrime contractor
Spread 1[5]Troy Construction
Spread 5[5]Troy Construction

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 2100 MMcf/d additional capacity (EIA)[1]
  • capacity of approximately 2.1 Bcf/d[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Permian Highway Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Facility Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
  3. “Kinder Morgan second-quarter 2018 results release (8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC filing). 18 July 2018. Retrieved 4 October 2026.
  4. “Altus Midstream Company annual report on Form 10-K for the year ended December 31, 2021”. Altus Midstream Company (filed with the SEC). 22 February 2022. Retrieved 4 October 2026.
  5. “Pipeline Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
  6. “Permian Highway Pipeline Project Details”. Pumpco, Inc. Archived from the original on 7 September 2024. Retrieved 3 October 2026.
  7. “MasTec, Inc. quarterly report on Form 10-Q for the quarter ended June 30, 2020”. MasTec, Inc. (filed with the SEC). 31 July 2020. Retrieved 4 October 2026.
  8. “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
  9. “Oil and Gas, SWCA (FERC services)”. SWCA Environmental Consultants. Retrieved 3 October 2026.
  10. “Welspun Corp | Projects”. Welspun Corp Ltd. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.