Port Arthur Pipeline Louisiana Connector

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Port Arthur Pipeline Louisiana Connector is a natural gas pipeline in Louisiana and Texas. Construction began in 2024.[1]

Port Arthur Pipeline Louisiana Connector
Also calledLouisiana Connector[3], Port Arthur Pipeline, Louisiana Connector- Port Arthur Pipeline[4], Planned Louisiana Connector Project[5]
General information
Project typeNew build[2][6]
StatusIn service[2][7][8] or Under construction[2][sources disagree]
CommodityNatural gas[2][7]
OperatorSempra Infrastructure[2][5] or Port Arthur Pipeline LLC[2][5][sources disagree]
Operator
Owner and operator
Facility project
StatesLouisiana, Texas[2]
CountiesLouisiana: Beauregard, Calcasieu, Cameron
Texas: Jefferson, Orange
[1]
Approved18 April 2019[4][10]
Construction startedNovember 2024[11]
In serviceJune 2026[7] or 1 June 2026[8][sources disagree]
FERC docketsCP18-7[4], CP23-513[3]
FERC pre-filing docketPF17-5[4]
Contractors
Technical information
Length72 mi[2] or 72.3 mi[10] or 77 mi[2][sources disagree]
Pipe size42"[2][10]
Wall thickness0.6, 0.72 and 0.864 in[11]
GradeX70[11]
Mill coatingExternal FBE 14-18 mils; some pipe adds 26-30 mils ARO or concrete; 3 mil internal[12]
Capacity2.0 Bcfd[1][2] or 2000 MMcf/d additional capacity (EIA)[2][sources disagree]
Costabout $1 billion (owner estimate, ENR)[2][13] or $1207 million (EIA estimate; no dollar year given)[2][sources disagree]
On ProvenHand
Hands listed0

Port Arthur Pipeline Louisiana Connector is a natural gas pipeline in Louisiana and Texas. Construction began in 2024.[1]

Contractorsedit

ContractorWorkPrime or subScope
Troy Construction[11]PrimeGeneral contractor, 72-mile 42-inch pipeline
Maxx HDD, LLC[11]HDD and boreUnder Troy ConstructionHDD subcontractor
Michels[11]HDD and boreUnder Troy ConstructionHDD subcontractor
HardRock Infrastructure Services[11]HDD and boreUnder Troy ConstructionHDD subcontractor
North Country Directional Drilling, LLC[11]HDD and boreUnder Troy ConstructionHDD subcontractor
The Trenchless Company[11]HDD and boreUnder Troy ConstructionDirect steerable pipe thrust (Kim Street crossing); Kim Street
Onward Resources[11]SurveyPipeline design and survey
HDR[11][14]Trenchless design, geotechnical engineering and construction consultantTrenchless crossings

Spreads

Spread
Spread 1[6][11][15][16]
Spread 2[11][15]

Crossings

FeatureMethodContractor
Clear Creek[17]HDD
Indian Bayou[17]HDD
Interstate 10[11]HDD
Kim Street[11][17]MicrotunnelThe Trenchless Company
Marsh Bayou[17]HDD
Sabine Lake[11]HDD
Sabine River Diversion Canal[17]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 2.0 Bcfd[1][2]
  • 2000 MMcf/d additional capacity (EIA)[2]
Cost
  • about $1 billion (owner estimate, ENR)[2][13]
  • $1207 million (EIA estimate; no dollar year given)[2]
In service
Length
Status
Operator

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Port Arthur Pipeline Louisiana Connector? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Port Arthur Pipeline Louisiana Connector”. Sempra Infrastructure. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP23-513”. Federal Energy Regulatory Commission. 14 July 2023. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC eLibrary docket PF17-5”. Federal Energy Regulatory Commission. 24 February 2017. Retrieved 3 October 2026.
  6. “Implementation Plan No. 6 (contractor yard variance requests), Louisiana Connector Project (CP18-7 et al.)”. Port Arthur Pipeline, LLC (filed with FERC). 4 October 2024. Retrieved 3 October 2026.
  7. “Sempra Infrastructure Announces In-Service of Port Arthur Pipeline Louisiana Connector”. Sempra Infrastructure. 9 June 2026. Retrieved 3 October 2026.
  8. “Affirmative Statement of Compliance, Louisiana Connector Project (CP18-7 et al.)”. Port Arthur Pipeline, LLC (filed with FERC). 24 June 2026. Retrieved 4 October 2026.
  9. “FERC eLibrary docket CP18-7”. Federal Energy Regulatory Commission. 16 October 2017. Retrieved 3 October 2026.
  10. “Request to Place Facilities In-Service, Port Arthur Pipeline Louisiana Connector Project (CP18-7, CP20-21, CP23-513)”. Port Arthur Pipeline, LLC (filed with FERC). 28 April 2026. Retrieved 3 October 2026.
  11. “Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings”. Underground Infrastructure (written by HDR staff). December 2025. Retrieved 3 October 2026.
  12. “Supplemental information to Implementation Plan No. 2 (alignment sheets), Louisiana Connector Project (CP18-7 et al.)”. Port Arthur Pipeline, LLC (filed with FERC). 6 September 2024. Retrieved 3 October 2026.
  13. “$1B Louisiana-to-Texas Gas Pipeline Reaches Finish”. Engineering News-Record. 2 July 2026. Retrieved 3 October 2026.
  14. “Port Arthur Pipeline Louisiana Connector (project portfolio)”. HDR. Retrieved 3 October 2026.
  15. “Weekly Status Report No. 30, Louisiana Connector Project (CP18-7, CP20-21, CP23-513)”. Port Arthur Pipeline, LLC (filed with FERC). 13 June 2025. Retrieved 3 October 2026.
  16. “Weekly Status Report No. 16, Louisiana Connector Project (CP18-7, CP20-21, CP23-513)”. Port Arthur Pipeline, LLC (filed with FERC). 4 March 2025. Retrieved 3 October 2026.
  17. “Environmental Assessment, Louisiana Connector Amendment Project (CP23-513)”. Federal Energy Regulatory Commission. 2 February 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.