HDR
From the ProvenHand pipeline wiki
HDR is a pipeline contractor.
| HDR | |
|---|---|
| General information | |
| Industry | |
| PLCA | Not a PLCA member as of 3 October 2026[3] |
| On ProvenHand | |
| Hands listed | 0 |
HDR is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Project built |
|---|---|---|---|
| Port Arthur Pipeline Louisiana Connector[1][2] | Trenchless design, geotechnical engineering and construction consultant | Trenchless crossings | 2024–2026 |
References
- “Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings”. Underground Infrastructure (written by HDR staff). December 2025. Retrieved 3 October 2026.
- “Port Arthur Pipeline Louisiana Connector (project portfolio)”. HDR. Retrieved 3 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.