Transco Southeastern Trail Expansion
From the ProvenHand pipeline wiki
Transco Southeastern Trail Expansion is a natural gas pipeline expansion, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]
| Transco Southeastern Trail Expansion | |
|---|---|
| Also called | Southeastern Trail, Southeastern Trail Expansion Project[5], Manassas Loop, Southeastern Trail Project[5] |
| General information | |
| Project type | Expansion[4] |
| Status | In service[4] |
| Commodity | Natural gas[4] |
| Operator | Williams (Transco) |
| Owner and operator | |
| State | VA or GA, LA, SC, VA[6] or AL, GA, LA, MS, NC, SC, VA[4][sources disagree] |
| Approved | 17 October 2019[6] |
| Construction started | January 2020[7] |
| In service | March 2021[4] |
| FERC docket | CP18-186[6] |
| Contractors | |
| Technical information | |
| Length | 7.7 mi[4][6] |
| Pipe size | 42" |
| Capacity | 296.38 MMcf/d (FERC project list)[6] or 296 MMcf/d additional capacity (EIA)[4][sources disagree] |
| Cost | $404.8 million (EIA estimate; no dollar year given)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Transco Southeastern Trail Expansion is a natural gas pipeline expansion, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Troy Construction[8] | Prime | Compressor Station 175 horsepower addition (Scottsville, VA): one 22,490 HP Solar Titan 130 unit |
| Troy Construction[8] | Prime | Station 115 reversal (Newnan, GA): piping and yard valves for bi-directional flow (page lists it as Station 115 Reversal; Transco) |
| Troy Construction[8] | Prime | Listed as SET Station 125 and Station 135 Deodorization (Monroe, GA and Belton, SC): deodorization vessels, canisters and piping (Transco) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Transco Southeastern Trail Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- ferc.gov · 10-2019-C-2.pdf
- williams.com
- princewilliamtimes.com · article_de44c3b7-a03c-5642-b031-f68302a8
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-186”. Federal Energy Regulatory Commission. 11 April 2018. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Biweekly Construction Status Report (Jan 11-24, 2020), Southeastern Trail Project (CP18-186)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 24 January 2020. Retrieved 4 October 2026.
- “Facility Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.