Blackcomb Pipeline
From the ProvenHand pipeline wiki
Blackcomb Pipeline is a natural gas pipeline in Texas, operated by WhiteWater. Construction began in 2025. It runs 365 miles of 42" pipe.[1]
| Blackcomb Pipeline | |
|---|---|
| Also called | Blackcomb |
| General information | |
| Project type | New build[7] |
| Status | Under construction[7][8] |
| Commodity | Natural gas[7] |
| Operator | WhiteWater |
| Operator | |
| Pipeline system | Blackcomb Pipeline[9] |
| State | Texas[7] |
| Counties | Crockett, Dimmit, Duval, Jim Wells, Kinney, La Salle, Martin, Maverick, McMullen, Midland, Nueces, Reagan, Upton, Val Verde, Zavala[9] |
| Construction started | 2025 |
| Contractors | |
| Technical information | |
| Length | 365 mi[1][7] |
| Pipe size | 42"[1][7] |
| Capacity | 2500 MMcf/d additional capacity (EIA)[1][7] |
| On ProvenHand | |
| Hands listed | 0 |
Blackcomb Pipeline is a natural gas pipeline in Texas, operated by WhiteWater. Construction began in 2025. It runs 365 miles of 42" pipe.[1]
Contractorsedit
| Contractor | Work | Prime or sub | Scope | Spread |
|---|---|---|---|---|
| Troy Construction[6] | Spread 4 (190 km of 42-inch) | |||
| MPG Pipeline Contractors[6] | Spread 5 (166 km of 42-inch) | |||
| Troy Construction[6] | Prime | Spread 4: 190 km of 42-inch, wall 15.6 to 22.5 mm, X-70 (RMS project list) | Spread 4 | |
| MPG Pipeline Contractors, LLC[6] | Prime | Spread 5: 166 km of 42-inch, wall 15.6 to 22.5 mm, X-70 (RMS project list) | Spread 5 | |
| RMS Welding Systems[6] | Mechanized welding | Under Troy Construction | MOWII mechanized welding system on Spread 4 | Spread 4 |
| RMS Welding Systems[6] | Mechanized welding | Under MPG Pipeline Contractors, LLC | MOWII mechanized welding system on Spread 5 | Spread 5 |
Pipe mills
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 4[6] | Troy Construction |
| Spread 5[6] | MPG Pipeline Contractors, LLC |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Blackcomb Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Blackcomb Pipeline Reaches Final Investment Decision to Transport Growing Natural Gas Production from the Permian Basin to the Gulf Coast Region”. WhiteWater (PR Newswire release). 31 July 2024. Retrieved 3 October 2026.
- pgjonline.com
- midlandtimes.com
- eia.gov
- ogj.com
- “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “MPLX LP Reports Second-Quarter 2026 Financial Results (Form 8-K, Exhibit 99.1)”. MPLX LP (filed with the SEC). 4 August 2026. Retrieved 3 October 2026.
- “New T-4 permits issued since January 1st, 2024 (permit 10643, WWM Operating, LLC: the T-4 permit EIA lists for Blackcomb)”. Railroad Commission of Texas. 4 December 2024. Retrieved 3 October 2026.
- “US subsidiary of Turkey's Borusan Boru to supply steel pipes to Blackcomb Mainline project”. SteelOrbis. 3 September 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.