Sardis Compressor Station Replacement
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Sardis Compressor Station Replacement is a natural gas pipeline replacement in Mississippi, operated by ANR Pipeline Company.
| Sardis Compressor Station Replacement | |
|---|---|
| Also called | Sardis Compressor Station Project[1], Sardis Compressor Station |
| General information | |
| Kind | Pipeline project[2] or Facility project[2][3][sources disagree] |
| Project type | Replacement[1] |
| Status | Approved[4] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Owner | |
| State | Mississippi[2][3] |
| Counties | Panola[2] |
| FERC docket | CP21-47[1] |
| Contractors | |
| Technical information | |
| Units added | 2 × Solar Mars 100 (gas turbine)[2] or 2 × Solar Mars 100[3][sources disagree] |
| Horsepower added | 31,000 hp[3] |
| Cost | approximately $93.7 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Sardis Compressor Station Replacement is a natural gas pipeline replacement in Mississippi, operated by ANR Pipeline Company.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Troy Construction[3] | Prime | 31,000 HP: two Solar Mars 100 units with gas coolers, filter separators, buildings and auxiliary systems (Panola, MS) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Kind | |
| Units added |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Sardis Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP21-47”. Federal Energy Regulatory Commission. 29 January 2021. Retrieved 3 October 2026.
- “Advance notification of natural gas facilities replacement under 18 CFR 2.55(b), Sardis Compressor Station (CP21-47)”. ANR Pipeline Company (filed with FERC). 3 February 2021. Retrieved 3 October 2026.
- “Facility Construction | Troy Companies”. Troy Construction. Retrieved 3 October 2026.
- “Environmental Assessment Report, Sardis Compressor Station replacement (CP21-47)”. FERC. 23 February 2021. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.