CP Express Pipeline Project Phase 1

From the ProvenHand pipeline wiki

CP Express Pipeline Project Phase 1 is a natural gas pipeline in Louisiana and Texas, operated by Venture Global. Construction began in 2025. It runs 91.4 miles of 24", 48" pipe.

CP Express Pipeline Project Phase 1
General information
KindPipeline project[1]
Project typeNew build[1]
StatusUnder construction[1]
CommodityNatural gas[1]
Operator
StatesLouisiana, Texas[1]
CountiesLouisiana: Calcasieu, Cameron
Texas: Jasper, Newton
[2]
Approved27 June 2024[3]
Construction started8 July 2025[4]
FERC docketCP22-22[1]
Contractors
Technical information
Length91.4 mi[1]
Pipe size24", 48"[1]
Capacity1800 MMcf/d additional capacity (EIA)[1]
On ProvenHand
Hands listed0

CP Express Pipeline Project Phase 1 is a natural gas pipeline in Louisiana and Texas, operated by Venture Global. Construction began in 2025. It runs 91.4 miles of 24", 48" pipe.

Contractorsedit

ContractorWorkPrime or subScopeSpread
Troy Construction[5]PrimeSpread 1: 77 km of 48-inch, wall 25.4 to 36.6 mm, X-70 (RMS project list)Spread 1
Sunland Construction, Inc.[5]PrimeSpread 2: 60 km of 48-inch, wall 25.4 to 36.6 mm, X-70 (RMS project list)Spread 2
RMS Welding Systems[5]Mechanized weldingUnder Troy ConstructionMOWII mechanized welding system on Spread 1Spread 1
RMS Welding Systems[5]Mechanized weldingUnder Sunland Construction, Inc.MOWII mechanized welding system on Spread 2Spread 2
Michels Trenchless, Inc.[6]HDD and boreSix HDDs totaling 17,916 ft of 48-inch pipe in Calcasieu and Cameron Parishes (job notice dated 2025-10-10)

Spreads

SpreadPrime contractor
Spread 1[5]Troy Construction
Spread 2[5]Sunland Construction, Inc.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CP Express Pipeline Project Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Final Environmental Impact Statement, CP2 LNG and CP Express Project (CP22-21, CP22-22)”. Federal Energy Regulatory Commission, Office of Energy Projects. 28 July 2023. Retrieved 3 October 2026.
  3. “Order Granting Authorizations Under Sections 3 and 7 of the Natural Gas Act, Venture Global CP2 LNG, LLC and Venture Global CP Express, LLC (CP22-21, CP22-22), 187 FERC 61,199”. Federal Energy Regulatory Commission. 27 June 2024. Retrieved 3 October 2026.
  4. “Notice of commencement of construction, CP Express Pipeline Project (CP22-22)”. Venture Global CP Express, LLC (filed with FERC). 16 July 2025. Retrieved 3 October 2026.
  5. “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
  6. “Teamsters National Pipeline job notification (Local Union 270, 2025-10-10): Michels Trenchless, Inc., CP Express HDD work”. Teamsters National Pipeline. 10 October 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.