Sunland Construction, Inc. is a pipeline contractor and a pipeline owner-operator based in Eunice, Louisiana.
| Sunland Construction, Inc. | |
|---|---|
| Also called |
|
| General information | |
| Industry | |
| Status | Active[6] |
| Predecessors |
|
| Headquarters | Eunice, Louisiana, United States[10][11] |
| Regions | CA,HI,NV,Pacific Islands, AZ,CO,NM,UT,WY, AK,ID,MT,OR,WA, OK,TX, Mexico, IL,IA,KS,MO,NE, MN,ND,SD,WI, Canada, IN,MI,OH, AL,AR,LA,MS,TN, FL,GA,SC,PR,VI, KY,NC,VA,WV, DE,MD,NJ,PA[2] or Southeast, Central, Rocky Mountain[7][sources disagree] |
| Website | www.sunlandconstruction.com[2] |
| PLCA | Not a PLCA member as of 3 October 2026[12] |
| On ProvenHand | |
| Hands listed | 0 |
Sunland Construction, Inc. is a pipeline contractor and a pipeline owner-operator based in Eunice, Louisiana.
This company article is a stub. You can help ProvenHand by expanding it.
Subsidiaries and plants
- Buffalo Gap Instrumentation and Electrical Company, Inc.[8] (contractor)
- DHB Services[7]
- Foremost Pipeline Construction Company, Inc.[8]
- Sunland Field Services, Inc.[13] (contractor)
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| CP Express Pipeline[4] | Hiring company on an HDD job notice | Named with Venture Global as the company on Michels Trenchless's CP Express HDD job notice (2025-10-10); role and spread not stated | 2025 | ||
| CP Express Pipeline Project Phase 1[14] | Prime | Spread 2: 60 km of 48-inch, wall 25.4 to 36.6 mm, X-70 (RMS project list) | Spread 2 | 2025 | |
| Midcontinent Supply Header Interstate Pipeline Project[15][16] | compressor station construction | 2020 | |||
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James)[17] | Prime | Spreads 3 and 4 (listed 2017-2019) | 2018–2019 | ||
| Cameron Access Project[18] | Prime | Listed 2017 as contractor: 34 miles of 30- and 36-inch near Lake Arthur, LA | 2018 | ||
| Coastal Bend Header[17][19][20] | Prime | Listed 2017 as contractor: 66 miles of 36-inch, three compressor stations and seven meter stations in Wharton and Brazoria counties, TX | 2017–2018 | ||
| Corpus Christi Pipeline[21] | compressor station construction (Sinton) | Construction Agreement for the Corpus Christi Pipeline Project dated 2016-11-04 (Exhibit 10.42 to the 2017 10-K); the agreement covers the Sinton compressor station, not the mainline | 2017–2018 | ||
| Gulf Trace Proj[22] | Prime | Listed 2017 as contractor: 8 miles of 36-inch in Cameron Parish, LA | 2016–2017 | ||
| HoustonLink[18] | Prime | Listed 2016-2017 as contractor: 9 miles of 24-inch in Houston, TX | 2016 | ||
| Loudon Expansion Project[18] | Prime | Listed 2017 as contractor: 10 miles of 12-inch in Bradley and Loudon counties, TN | 2016 | ||
| Line 1 Replacement Project[23] | Prime | 2012 | |||
| Acadian Haynesville Extension[24] | Prime | Gulf Coast Division, July 2011: one crew laying 48 miles of 36-inch for the Enterprise/Acadian Gas Haynesville Extension and a second crew laying the last 7.5 miles of 36-inch (push work); about 400 employees on the 48-mile spread | 2011 | ||
| Highway 19 Relocation Project[25] | Prime | FGT's contractor for the Highway 19 relocation of the St. Petersburg Lateral (mobilized March 22, 2010) | 2010 | ||
| Elba Express Interconnects Project[26] | Prime | Interconnect construction at the Georgia and South Carolina meter sites: welding, excavation, hydrostatic test and tie-in (construction progress reports, Oct to Nov 2009) | 2009 | ||
| Cheniere Creole Trail Pipeline[27] | Prime | Spread one, the first 18-mile 42-inch spread | from 1 September 2007 | 2007–2008 | |
| Cheniere Creole Trail Pipeline[28] | Prime | Creole Trail Pipeline Segment 1 (Preferred Route Single Line Option) under the construction agreement dated 2007-03-12; Change Order 1 dated 2008-02-07 added a push site | 2007–2008 | ||
| Discovery Pipeline[29] | Prime | Onshore 20-in. residue line (5 miles of new 20-in. line from the Larose plant to Texas Eastern), awarded as additional onshore construction on the Discovery system | 1997 | ||
| Creole Trail Lng, LP And Cheniere Creole Trail Pipeline coastal use permit P20051399 pipeline[30] | Prime | Construction agreement for Segment 2 (about 23.39 miles of 42-inch pipeline), dated January 2007 | Segment 2 | ||
| Creole Trail Lng, LP And Cheniere Creole Trail Pipeline coastal use permit P20051399 pipeline[31] | Prime | Segment 2 construction under way from the week of May 6-12, 2007 (weekly status report No. 1: contractor began unloading mats at MP 0.6; schedule shows Segment 2 construction 2007-04-09 to 2008-01-04) | Segment 2 | from 1 May 2007 | |
| Eastern Shore Natural Gas Delaware Compressor Station (Delaware City)[32] | Prime | Listed under 1999 Sunland Station Projects: Delaware Compressor Station, Delaware City, DE, for Eastern Shore Natural Gas | until 1 January 1999 | ||
| FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)[32] | Prime | Listed under 1999 Sunland Station Projects: 36-inch mainline replacement at C/S 15, Perry, FL, for Florida Gas Transmission | until 1 January 1999 | ||
| Kinder Morgan Lake Houston HDD Crossing Replacement[1] | Prime | Pipe contractor for the replacement of a 6-in. steel gas pipeline under Lake Houston by a 10,971-ft HDD (tie-in welds at pullback) | |||
| North Carolina Natural Gas Clayton Compressor Station[32] | Prime | Listed under 1999 Sunland Station Projects: install Clayton Compressor Station, Clayton, NC, for North Carolina Natural Gas | until 1 January 1999 | ||
| Pump Mesa Gathering System[33] | Prime | Listed under the page heading 1997 Pipeline Construction Projects (partial listing of completed projects): 27 miles of 6-, 8-, 10-, 16- and 20-inch pipe, Pump Mesa, NM | until 1 January 1997 | ||
| RGP Pipeline and Rail Terminal Expansion[34] | Prime | Listed 2017-2018 as contractor: 65-mile 20-inch lateral, Sorrento to Breaux Bridge, LA | |||
| SNG Drummond Coal Mine Relocation Project[35] | Prime | Relocation of 24-inch and 30-inch SNG pipelines around the Drummond coal mine, Alabama, 1998 (Eastern Division under the SNG alliance), including two 2,800-ft directional drills in hard rock | until 1 January 1998 | ||
| SNG Drummond Coal Mine Relocation Project[36] | HDD and bore | Listed under 1998 Directional Drill Projects: Southern Natural Gas Co., 2,800 ft of 24-inch and 2,800 ft of 30-inch, Adger, AL (own directional drilling division); Drummond coal mine relocation, Adger, Alabama (24-inch drill) | until 1 January 1998 | ||
| Sasol & Evangeline[19] | Prime | Listed 2017 as contractor: 25 miles of 12- and 16-inch near Sulphur, LA | |||
| Sinton Compressor Station[37] | Prime | Construction Agreement dated 2016-11-04 with Cheniere Corpus Christi Pipeline, L.P. for the Sinton compressor station: two Solar Titan 130E gas compressors, two Solar/ABB 14,800 HP electric motor drive compressors, buildings, piping, I&E | |||
| Sinton Compressor Station EMD Project[37] | Prime | Two Solar/ABB 14,800 HP electric motor drive compressor packages at the Sinton site, under the 2016-11-04 Construction Agreement for the Corpus Christi Pipeline Project | |||
| Transco 15,000 HP Compressor Station, Coosa County, Alabama (1997)[38] | Prime | Listed under 1997 Sunland Station Projects: 15,000 HP compressor station for Transcontinental Gas Pipeline in association with Stone & Webster, Coosa County, Alabama | until 1 January 1997 | ||
| Transco Compressor Station 115 (grassroots, Newnan, Georgia)[39] | Prime | Listed under 1998 Sunland Station Projects: 16,000 HP GE, grassroots Compressor Station 115, Newnan, Georgia | until 1 January 1998 | ||
| Transco Compressor Station 82 Addition (Coden, Alabama)[39] | Prime | Listed under 1998 Sunland Station Projects: 15,000 HP addition to Compressor Station 82, Coden, Alabama | until 1 January 1998 | ||
| Transco Compressor Station 83 (grassroots, Citronelle, Alabama)[39] | Prime | Listed under 1998 Sunland Station Projects: 15,000 HP Mars turbine, grassroots Compressor Station 83, Citronelle, Alabama | until 1 January 1998 | ||
| Wacker Project[40] | Prime | Hired as the construction contractor for the Wacker Project (East Tennessee's April 2013 letter to FERC) |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James) | Spread 3[17] | |
| Bayou Bridge Pipeline (Phase 2, Lake Charles to St. James) | Spread 4[17] | |
| CP Express Pipeline Project Phase 1 | Spread 2[14] | |
| Coastal Bend Header | Spread 1[41] | |
| Creole Trail Lng, LP And Cheniere Creole Trail Pipeline coastal use permit P20051399 pipeline | Segment 2[30][31] | from 1 May 2007 |
Crossings
Crossings this company drilled or bored.
| Project | Feature | Dates |
|---|---|---|
| SNG Drummond Coal Mine Relocation Project | Drummond coal mine relocation, Adger, Alabama (24-inch drill)[36] | until 1 January 1998 |
| SNG Drummond Coal Mine Relocation Project | Drummond coal mine relocation, Adger, Alabama (30-inch drill)[36] | until 1 January 1998 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Regions |
References
- “NEW INSTALL WINNER: Record-Setting Lake Houston HDD Project”. Trenchless Technology. 11 October 2012. Retrieved 6 October 2026.
- “APCA member directory entry: Sunland Construction, Inc.”. American Pipeline Contractors Association. Retrieved 3 October 2026.
- “Sunland Construction, Inc. home page”. Sunland Construction, Inc. Retrieved 3 October 2026.
- “Teamsters National Pipeline job notification (Local Union 270, 2025-10-10): Michels Trenchless, Inc., CP Express HDD work”. Teamsters National Pipeline. 10 October 2025. Retrieved 3 October 2026.
- “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
- “https://www.sunlandconstruction.com/about”. Sunland Construction, Inc. Retrieved 3 October 2026.
- “Company History (2000 site)”. Sunland Construction, Inc. Archived from the original on 14 June 2000. Retrieved 6 October 2026.
- “Company History (timeline)”. Sunland Construction, Inc. Archived from the original on 20 June 2017. Retrieved 6 October 2026.
- “Finance/Companies news briefs, Nov. 22”. Oil & Gas Journal. 22 November 2000. Retrieved 6 October 2026.
- “Facility Construction | Sunland Construction”. Sunland Construction, Inc. Retrieved 3 October 2026.
- “Contact | Sunland Construction”. Sunland Construction, Inc. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Black Horse Construction, Inc. Acquisition (Sunland News, April 1, 2012)”. Sunland Construction, Inc. 1 April 2012. Archived from the original on 24 August 2012. Retrieved 6 October 2026.
- “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
- “Midship Pipeline Project, Oklahoma, USA”. NS Energy. 12 October 2018. Retrieved 4 October 2026.
- “TRC Chosen to Provide Array of Integrated Services on Midship Pipeline Project”. TRC Companies, Inc. 28 August 2018. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, June 2018)”. Pipeline News. June 2018. Retrieved 3 October 2026.
- “Cheniere Corpus Christi Holdings, LLC Form 10-K for 2017 (exhibit index: Construction Agreement for the Corpus Christi Pipeline Project, CCP and Sunland Construction, Inc., November 4, 2016)”. Cheniere Corpus Christi Holdings, LLC (filed with the SEC). 21 February 2018. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
- “Weekly Report No. 1, June 18 to 24, 2012, Line 1 Replacement Project (CP12-101)”. Carolina Gas Transmission Corporation (filed with FERC). 29 June 2012. Retrieved 4 October 2026.
- “Gulf Coast Division (Sunland News, July 1, 2011)”. Sunland Construction, Inc. 1 July 2011. Archived from the original on 15 March 2012. Retrieved 6 October 2026.
- “Weekly Environmental Status Report No. 1, Florida Gas Transmission Company, LLC (CP10-12)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 April 2010. Retrieved 4 October 2026.
- “Construction Progress Report for 10/12/2009 through 11/14/2009, Elba Express Pipeline Interconnect Project, Transcontinental Gas Pipe Line Company, LLC (CP09-88)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 November 2009. Retrieved 4 October 2026.
- “Cheniere Energy Awards Contracts, Begins Construction on Creole Trail Natural Gas Pipeline”. Industrial Info Resources. 19 October 2007. Retrieved 3 October 2026.
- “Change Order 1 to Construction Agreement dated March 12, 2007, Creole Trail Pipeline Segment 1 (Exhibit 10.95 to Cheniere Energy 10-K)”. Cheniere Energy, Inc. (filed with the SEC). 27 February 2008. Retrieved 6 October 2026.
- “New gulf pipeline begins feeds to Louisiana processing”. Oil & Gas Journal. 19 October 1998. Retrieved 6 October 2026.
- “Construction Agreement for the Creole Trail Pipeline - Segment 2 Project (Cheniere Creole Trail Pipeline, L.P. and Sunland Construction, Inc.), Exhibit 10.1”. Cheniere Energy, Inc. (filed with SEC). 5 January 2007. Retrieved 4 October 2026.
- “Cheniere Creole Trail Pipeline, L.P., Segment 2 weekly status report No. 1, May 6-12, 2007 (CP05-357)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 18 May 2007. Retrieved 6 October 2026.
- “1999 Sunland Station Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.
- “https://web.archive.org/web/20010308060443id_/http://www.sunlandconstruction.com:80/1997-pc.html”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
- “Eastern Division Continues to Roll (Sunland News, September 27, 2010)”. Sunland Construction, Inc. 27 September 2010. Archived from the original on 17 December 2010. Retrieved 6 October 2026.
- “1998 Directional Drill Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.
- “Construction Agreement for the Corpus Christi Pipeline Project (Sinton compressor station), Exhibit 10.40 to Form S-4”. Cheniere Corpus Christi Holdings, LLC (filed with the SEC). 5 January 2017. Retrieved 6 October 2026.
- “1997 Sunland Station Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.
- “1998 Sunland Station Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.
- “Supplemental Information (construction contractor), Wacker Project (CP12-484)”. East Tennessee Natural Gas, LLC (filed with FERC). 19 April 2013. Retrieved 4 October 2026.
- “Environmental Compliance Monitoring Program Weekly Summary Report (Feb 20-25, 2017), Coastal Bend Header Project (CP15-517)”. FERC (third-party compliance monitoring report). 13 March 2017. Retrieved 4 October 2026.