SNG Drummond Coal Mine Relocation Project is a pipeline replacement in Alabama.

SNG Drummond Coal Mine Relocation Project
General information
KindPipeline project[1]
Project typeReplacement[1]
Owner
StateAlabama[1]
Contractors
Technical information
Pipe size24", 30"[1]
On ProvenHand
Hands listed0

SNG Drummond Coal Mine Relocation Project is a pipeline replacement in Alabama.

Contractorsedit

ContractorWorkScopeYears
Sunland Construction, Inc.[1]PrimeRelocation of 24-inch and 30-inch SNG pipelines around the Drummond coal mine, Alabama, 1998 (Eastern Division under the SNG alliance), including two 2,800-ft directional drills in hard rockuntil 1 January 1998
Sunland Construction, Inc.[2]HDD and boreListed under 1998 Directional Drill Projects: Southern Natural Gas Co., 2,800 ft of 24-inch and 2,800 ft of 30-inch, Adger, AL (own directional drilling division); Drummond coal mine relocation, Adger, Alabama (24-inch drill)until 1 January 1998

Crossings

FeatureMethodContractorDates
Drummond coal mine relocation, Adger, Alabama (24-inch drill)[2]HDDSunland Construction, Inc.until 1 January 1998
Drummond coal mine relocation, Adger, Alabama (30-inch drill)[2]HDDSunland Construction, Inc.until 1 January 1998

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on SNG Drummond Coal Mine Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Eastern Division Continues to Roll (Sunland News, September 27, 2010)”. Sunland Construction, Inc. 27 September 2010. Archived from the original on 17 December 2010. Retrieved 6 October 2026.
  2. “1998 Directional Drill Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.