Gulf Trace Proj is a natural gas pipeline, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2016. It runs 7 miles of 36" pipe.

Gulf Trace Proj
Also calledGulf Trace Expansion Project[1]
General information
KindPipeline project[1]
Project typeLateral[2] or Expansion[3][sources disagree]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateLA[1] or LA, MS[2][sources disagree]
CountiesCameron[4]
Approved21 October 2015[1]
Construction started22 January 2016[5]
In serviceJanuary 2017[2] or 1 February 2017[6][sources disagree]
FERC docketCP15-29[1]
Contractors
Technical information
Length7 mi[1][2]
Pipe size36"[2][4]
Capacity1200 MMcf/d (FERC project list)[1][2]
Cost$278 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Gulf Trace Proj is a natural gas pipeline, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2016. It runs 7 miles of 36" pipe.

Contractorsedit

ContractorWorkScope
Sunland Construction, Inc.[4]PrimeListed 2017 as contractor: 8 miles of 36-inch in Cameron Parish, LA

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
In service
  • January 2017[2]
  • 1 February 2017[6]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulf Trace Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP15-29”. Federal Energy Regulatory Commission. 15 December 2014. Retrieved 3 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
  5. “Bi-weekly construction status report, Gulf Trace Expansion Project (CP15-29)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 4 February 2016. Retrieved 4 October 2026.
  6. “Notification that the Gulf Trace Expansion Project was placed into service (CP15-29)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 3 February 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.