Corpus Christi Pipeline

From the ProvenHand pipeline wiki

Corpus Christi Pipeline is a natural gas pipeline in Texas, operated by Cheniere. Construction began in 2017 and the line entered service in 2018. It runs 23 miles of 48" pipe.[1]

Corpus Christi Pipeline
Also calledCCP, Cheniere Corpus Christi Pipeline[4]
General information
Project typeNew build[5]
StatusIn service[5]
CommodityNatural gas[5]
OperatorCheniere
Owner and operator
Facility project
StateTexas[4][5]
Approved30 December 2014[4]
Construction started2017
In service23 May 2018[5]
FERC docketCP12-508[4]
FERC pre-filing docketPF12-3[4]
Contractors
Technical information
Length23 mi[4][5]
Pipe size48"[5]
Capacity2250 MMcf/d (FERC project list)[4][5]
Cost$500 million (EIA estimate; no dollar year given)[5]
On ProvenHand
Hands listed0

Corpus Christi Pipeline is a natural gas pipeline in Texas, operated by Cheniere. Construction began in 2017 and the line entered service in 2018. It runs 23 miles of 48" pipe.[1]

Contractorsedit

ContractorWorkScopeYears
Associated Pipe Line Contractors[3]pipeline construction
Associated Pipe Line Contractors, Inc.[7]PrimeMainline, pre-jobbed at Sinton, TX: 21.6 miles of 48-inch and 2.7 miles of 36-inch for Cheniere Energy; started 2017-01-05, approx. completion 2017-06-11from 5 January 2017
Associated Pipe Line Contractors, Inc.[8][9]PrimeCheniere CCPL work in Nueces and San Patricio Counties, TX: 21.6 miles of 36-inch and 48-inch pipeline
Sunland Construction, Inc.[10]compressor station construction (Sinton)Construction Agreement for the Corpus Christi Pipeline Project dated 2016-11-04 (Exhibit 10.42 to the 2017 10-K); the agreement covers the Sinton compressor station, not the mainline
Associated Pipe Line Contractors, Inc.[10]PrimeConstruction Agreement for the Corpus Christi Pipeline Project dated 2016-11-10 between Cheniere Corpus Christi Pipeline, L.P. and the firm

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Corpus Christi Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. sec.gov · cei2018form10-k.htm
  2. sec.gov · cei2016form10-k.htm
  3. s3.amazonaws.com · Ongoing_Projects.pdf
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  6. “Construction Agreement for the Corpus Christi Pipeline Project (Sinton compressor station), Exhibit 10.40 to Form S-4”. Cheniere Corpus Christi Holdings, LLC (filed with the SEC). 5 January 2017. Retrieved 6 October 2026.
  7. “Blue Light Reports, March 2017 (pre-jobs)”. Pipeliners Local Union 798. March 2017. Retrieved 6 October 2026.
  8. “Land Division (recent projects) (Wayback capture 2020-08-11)”. Associated Pipe Line Contractors, Inc. Archived from the original on 11 August 2020. Retrieved 3 October 2026.
  9. “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
  10. “Cheniere Corpus Christi Holdings, LLC Form 10-K for 2017 (exhibit index: Construction Agreement for the Corpus Christi Pipeline Project, CCP and Sunland Construction, Inc., November 4, 2016)”. Cheniere Corpus Christi Holdings, LLC (filed with the SEC). 21 February 2018. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.