Cheniere Corpus Christi Pipeline
From the ProvenHand pipeline wiki
Cheniere Corpus Christi Pipeline is a pipeline owner-operator based in Houston, Texas.
| Cheniere Corpus Christi Pipeline | |
|---|---|
| Legal name | CHENIERE CORPUS CHRISTI PIPELINE[1] |
| General information | |
| Industry | |
| Headquarters | Houston, Texas[1] |
| PHMSA operator ID | 39429[3] |
| On ProvenHand | |
| Hands listed | 0 |
Cheniere Corpus Christi Pipeline is a pipeline owner-operator based in Houston, Texas.
This company article is a stub. You can help ProvenHand by expanding it.
Pipeline systems and facilities
1 system and facility this company owned or operated, current ones first.
| System or facility | Kind | State | Role |
|---|---|---|---|
| Cheniere Corpus Christi Pipeline[1] | Pipeline system | TX | Operator |
Projects
As owner or operator
| Project | Role | Status | Project built |
|---|---|---|---|
| Corpus Christi Pipeline[2] | Owner and operator | In service | 2017–2018 |
| CCPL Expansion Project[3] | Operator | Proposed | |
| CCPL Expansion Project[4] | Owner and operator | Proposed | |
| Corpus Christi Liquefaction Project[5] | Owner and operator | ||
| Sinton 2 Compressor Station[6] | Owner and operator | Proposed | |
| Sinton Compressor Station[7] | Owner | ||
| Sinton Compressor Station EMD Project[8] | Owner and operator | ||
| transports Corpus Christi LNG, L.P.'s 2,600 MMcf/d[2] | Owner and operator |
References
- “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Data request letter to Cheniere Corpus Christi Pipeline, L.P., CCPL Expansion Project (CP26-87)”. Federal Energy Regulatory Commission. 16 March 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP12-507”. Federal Energy Regulatory Commission. 31 August 2012. Retrieved 3 October 2026.
- “Application for authorization under NGA section 3 (CCL Stage 4 Project) and certificate (CCPL Expansion Project)”. Corpus Christi Liquefaction Stage IV, LLC; Corpus Christi Liquefaction, LLC; Cheniere Corpus Christi Pipeline, L.P. (filed with FERC). 4 February 2026. Retrieved 3 October 2026.
- “Construction Agreement for the Corpus Christi Pipeline Project (Sinton compressor station), Exhibit 10.40 to Form S-4”. Cheniere Corpus Christi Holdings, LLC (filed with the SEC). 5 January 2017. Retrieved 6 October 2026.
- “FERC eLibrary docket CP16-59”. Federal Energy Regulatory Commission. 15 January 2016. Retrieved 3 October 2026.