Corpus Christi Liquefaction Project
From the ProvenHand pipeline wiki
Corpus Christi Liquefaction Project is a facility project, operated by Cheniere Corpus Christi Pipeline.
| Corpus Christi Liquefaction Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Owner and operator | |
| Approved | 30 December 2014[2] |
| FERC docket | CP12-507[1] |
| Doe lng dockets | 12-97-LNG[3], 12-99-LNG[3] |
| Contractors | |
| On ProvenHand | |
| Hands listed | 0 |
Corpus Christi Liquefaction Project is a facility project, operated by Cheniere Corpus Christi Pipeline.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Bechtel Oil, Gas and Chemicals, Inc.[4] | Prime | Two lump-sum turnkey EPC contracts for the Corpus Christi LNG trains and related facilities (Cheniere release, Dec 9, 2013) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Corpus Christi Liquefaction Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP12-507”. Federal Energy Regulatory Commission. 31 August 2012. Retrieved 3 October 2026.
- “Implementation Plan-A, Corpus Christi Liquefaction Project (CP12-507, CP12-508)”. Corpus Christi Liquefaction, LLC and Cheniere Corpus Christi Pipeline, L.P. (filed with FERC). 31 December 2014. Retrieved 4 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Cheniere Enters into Lump Sum Turnkey Contracts with Bechtel for Corpus Christi Liquefaction Project (8-K exhibit 99.1)”. Cheniere Energy, Inc. 9 December 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.