CCPL Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

CCPL Expansion Project is a natural gas pipeline in Texas, operated by Corpus Christi Liquefaction Stage IV, LLC.

CCPL Expansion Project
Also calledCCPL Expansion Project (Corpus Christi Stage IV)[1]
General information
KindPipeline project[2]
Project typeExpansion[1][2][3][4] or Loop[5][sources disagree]
StatusProposed[3][4][5][6] or Pre-filing[3][4][sources disagree]
CommodityNatural gas[3][7]
Owners and operators
Operator
Facility projects
StateTexas[3][5][10]
CountiesSan Patricio, TX[5][7][10] or Nueces, TX; San Patricio, TX[10][sources disagree]
FERC docketCP26-87[2]
FERC pre-filing docketPF25-10[7]
Contractors
Technical information
Length25.8 mi[3][5][7] or 26 mi[3][sources disagree]
Pipe size42"[3][5][7]
Capacityan average of approximately 2.75 Bcf/d to the CCL Terminal and the CCL Stage 4 Project[3][7] or 3000 MMcf/d additional capacity (EIA)[3][sources disagree]
Costapproximately $676,380,295 incl. AFUDC: $285,654,210 pipeline, $264,707,298 compression, $126,018,786 M&R (no dollar yea[7]
On ProvenHand
Hands listed0

CCPL Expansion Project is a natural gas pipeline in Texas, operated by Corpus Christi Liquefaction Stage IV, LLC.

Contractorsedit

ContractorWorkScope
SLR International Corporation[11]Acoustical consultant (HDD noise analysis)Noise-sensitive-area maps and HDD construction noise analysis for the CCPL 42-inch pipeline HDDs (Resource Report 9 figures reproduced in the draft EIS)

Crossings

FeatureMethod
Chiltipin Creek, two wetlands and private roads (HDD4, MP 22.1-22.6)[11]HDD
Foreign pipelines and a drainage ditch (HDD2, MP 8.0-8.3)[11]HDD
Oliver Creek and public roads (HDD3, MP 20.9-21.4)[11]HDD
Plant roads, pipeline corridor and pipe rack at the CCL terminal (CCL Stage 4 Terminal Supply Line HDD, MP 0.5-0.9)[11]HDD
Railroad and private roads (HDD5, MP 23.2-23.5)[11]HDD
Reynolds Road, railroad tracks and pipelines (HDD1, MP 0.0-0.4)[11]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • an average of approximately 2.75 Bcf/d to the CCL Terminal and the CCL Stage 4 Project[3][7]
  • 3000 MMcf/d additional capacity (EIA)[3]
Project type
Counties
Length
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CCPL Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-82”. Federal Energy Regulatory Commission. 3 February 2026. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP26-87”. Federal Energy Regulatory Commission. 3 February 2026. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “FERC eLibrary docket PF25-10”. Federal Energy Regulatory Commission. 17 July 2025. Retrieved 3 October 2026.
  5. “Notice of Availability of the Draft Environmental Impact Statement for the Proposed Corpus Christi Liquefaction Stage 4 Project and the CCPL Expansion Project”. Federal Energy Regulatory Commission. 18 September 2026. Retrieved 3 October 2026.
  6. “Notice of Application and Establishing Intervention Deadline, Corpus Christi Liquefaction Stage IV, LLC et al., Corpus Christi Liquefaction Stage 4 Project et al. (CP26-82 et al.)”. FERC (eLibrary filing description). 17 February 2026. Retrieved 4 October 2026.
  7. “Application for authorization under NGA section 3 (CCL Stage 4 Project) and certificate (CCPL Expansion Project)”. Corpus Christi Liquefaction Stage IV, LLC; Corpus Christi Liquefaction, LLC; Cheniere Corpus Christi Pipeline, L.P. (filed with FERC). 4 February 2026. Retrieved 3 October 2026.
  8. “Data request letter to Cheniere Corpus Christi Pipeline, L.P., CCPL Expansion Project (CP26-87)”. Federal Energy Regulatory Commission. 16 March 2026. Retrieved 3 October 2026.
  9. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  10. “Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned CCL Stage 4 Project and CCPL Expansion Project, Corpus Christi Liquefaction Stage IV, LLC et al. (PF25-10)”. FERC (public notice, eLibrary). 24 November 2025. Retrieved 4 October 2026.
  11. “Draft Environmental Impact Statement, Corpus Christi Liquefaction Stage 4 Project and CCPL Expansion Project (CP26-82-000 et al.)”. Federal Energy Regulatory Commission. 18 September 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.