SLR International Corporation
From the ProvenHand pipeline wiki
SLR International Corporation is a pipeline contractor.
| SLR International Corporation | |
|---|---|
| General information | |
| Industry | |
| PLCA | Not a PLCA member as of 3 October 2026[4] |
| On ProvenHand | |
| Hands listed | 0 |
SLR International Corporation is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Years | Project built |
|---|---|---|---|---|
| Swarts and Hunters Cave Well Replacement Project[2][3] | Construction noise monitoring consultant | Construction noise monitoring at the Hunters Cave (2024) and Swarts (2026) storage well sites | from 1 October 2024 | 2024 |
| Compressor Station 500C-1 Turbine Uprate and Compressor Restage Project[5] | Acoustic consultant (post-construction noise survey) | Prepared the post-construction noise study for Compressor Station 500 Unit C-1 for Tennessee (surveys filed January 2022) | 2021 | |
| Compressor Station 321 Turbine Replacement Project[6] | Acoustic consultant (post-construction sound level survey) | Tennessee retained it for the post-construction sound level survey of the Unit 1C turbine replacement at Compressor Station 321 | 2019 | |
| CCPL Expansion Project[1] | Acoustical consultant (HDD noise analysis) | Noise-sensitive-area maps and HDD construction noise analysis for the CCPL 42-inch pipeline HDDs (Resource Report 9 figures reproduced in the draft EIS) |
References
- “Draft Environmental Impact Statement, Corpus Christi Liquefaction Stage 4 Project and CCPL Expansion Project (CP26-82-000 et al.)”. Federal Energy Regulatory Commission. 18 September 2026. Retrieved 3 October 2026.
- “Bi-Weekly Status Report No. 17 (with construction noise monitoring memo), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 22 October 2024. Retrieved 3 October 2026.
- “Biweekly Status Report No. 48 (with Swarts well noise monitoring report), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 21 July 2026. Retrieved 3 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Post-construction noise surveys transmittal, Compressor Station 500C-1 Turbine Uprate and Restage Project (CP21-481)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 18 January 2022. Retrieved 4 October 2026.
- “Post-construction sound level survey transmittal, Compressor Station 321 turbine replacement (CP19-469)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 7 November 2019. Retrieved 4 October 2026.