Compressor Station 321 Turbine Replacement Project is a natural gas facility project in Pennsylvania, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2019.
| Compressor Station 321 Turbine Replacement Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Replacement[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Pennsylvania[3] |
| Counties | Susquehanna[3] |
| Construction started | September 2019[1] |
| FERC docket | CP19-469[2] |
| Contractors | |
| Technical information | |
| Capacity added | up to 10,000 dekatherms per day[3] |
| On ProvenHand | |
| Hands listed | 0 |
Compressor Station 321 Turbine Replacement Project is a natural gas facility project in Pennsylvania, operated by Tennessee Gas Pipeline Company, L.L.C.. Construction began in 2019.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| SLR International Corporation[4] | Acoustic consultant (post-construction sound level survey) | Tennessee retained it for the post-construction sound level survey of the Unit 1C turbine replacement at Compressor Station 321 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Compressor Station 321 Turbine Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Weekly status report, Compressor Station 321 Turbine Replacement Project (CP19-469)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 23 September 2019. Retrieved 4 October 2026.
- “FERC eLibrary docket CP19-469”. Federal Energy Regulatory Commission. 15 May 2019. Retrieved 3 October 2026.
- “Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization (CP19-469)”. Federal Energy Regulatory Commission (Federal Register notice). 29 May 2019. Retrieved 4 October 2026.
- “Post-construction sound level survey transmittal, Compressor Station 321 turbine replacement (CP19-469)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 7 November 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.