Swarts and Hunters Cave Well Replacement Project
From the ProvenHand pipeline wiki
Swarts and Hunters Cave Well Replacement Project is a natural gas facility project in Pennsylvania, operated by Equitrans, L.P.. Construction began in 2024. It runs 0.7 miles of 12" pipe.
| Swarts and Hunters Cave Well Replacement Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1][2] |
| Status | Under construction[3] |
| Commodity | Natural gas[4] |
| Owner and operator | |
| State | Pennsylvania[2] |
| Counties | Greene[2] |
| Approved | 31 January 2024[4] |
| Construction started | 25 March 2024[5] |
| FERC docket | CP23-507[1] |
| Contractors | |
| Technical information | |
| Length | 0.7 mi[6] |
| Pipe size | 12"[2] |
| Cost | $7,295,312[4] |
| On ProvenHand | |
| Hands listed | 0 |
Swarts and Hunters Cave Well Replacement Project is a natural gas facility project in Pennsylvania, operated by Equitrans, L.P.. Construction began in 2024. It runs 0.7 miles of 12" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| SLR International Corporation[7][8] | Construction noise monitoring consultant | Construction noise monitoring at the Hunters Cave (2024) and Swarts (2026) storage well sites | from 1 October 2024 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Swarts and Hunters Cave Well Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-507”. Federal Energy Regulatory Commission. 30 June 2023. Retrieved 3 October 2026.
- “Environmental Assessment, Swarts and Hunters Cave Well Replacement Project (CP23-507)”. FERC Office of Energy Projects. 8 December 2023. Retrieved 3 October 2026.
- “Biweekly Status Report No. 51 (Aug 15 to Aug 28, 2026), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 31 August 2026. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Equitrans, L.P. (186 FERC 62,040)”. FERC. 31 January 2024. Retrieved 3 October 2026.
- “Request for authorization to commence service (Hunters Cave well), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 5 November 2024. Retrieved 3 October 2026.
- “Application, Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 30 June 2023. Retrieved 3 October 2026.
- “Bi-Weekly Status Report No. 17 (with construction noise monitoring memo), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 22 October 2024. Retrieved 3 October 2026.
- “Biweekly Status Report No. 48 (with Swarts well noise monitoring report), Swarts and Hunters Cave Well Replacement Project (CP23-507)”. Equitrans, L.P. (filed with FERC). 21 July 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.