Corpus Christi Liquefaction Stage 4

From the ProvenHand pipeline wiki

Corpus Christi Liquefaction Stage 4 is a natural gas facility project at Corpus Christi LNG in Texas, operated by Corpus Christi Liquefaction Stage IV, LLC.

Corpus Christi Liquefaction Stage 4
Also calledCCL Stage 4 Project[1], CCL Expansion Project[2]
General information
KindFacility project[3]
Project typeAdded train[1]
StatusProposed[1][4]
CommodityNatural gas[1]
Owner and operator
Part ofCCPL Expansion Project[4]
FacilityCorpus Christi LNG[4]
StateTexas[1][4]
CountiesNueces, San Patricio[1]
FERC docketCP26-82[3]
Doe lng docket26-32-LNG[5]
Technical information
Capacity added3.32 Bcfd (FERC LNG map, Sep 2026)[4]
LNG trains added4[1]
Liquefaction added24 MTPA[6]
On ProvenHand
Hands listed0

Corpus Christi Liquefaction Stage 4 is a natural gas facility project at Corpus Christi LNG in Texas, operated by Corpus Christi Liquefaction Stage IV, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Corpus Christi Liquefaction Stage 4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Draft Environmental Impact Statement, Corpus Christi Liquefaction Stage 4 Project and CCPL Expansion Project (CP26-82-000 et al.)”. Federal Energy Regulatory Commission. 18 September 2026. Retrieved 3 October 2026.
  2. “Cheniere Energy, Inc. Form 10-Q for the quarter ended June 30, 2026”. Cheniere Energy, Inc. (SEC EDGAR). 6 August 2026. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP26-82”. Federal Energy Regulatory Commission. 3 February 2026. Retrieved 3 October 2026.
  4. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  5. “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
  6. “Application for authorization under NGA section 3 (CCL Stage 4 Project) and certificate (CCPL Expansion Project)”. Corpus Christi Liquefaction Stage IV, LLC; Corpus Christi Liquefaction, LLC; Cheniere Corpus Christi Pipeline, L.P. (filed with FERC). 4 February 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.