Cheniere Creole Trail Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Cheniere Creole Trail Pipeline is a natural gas pipeline. Construction began in 2007 and the line entered service in 2008.

Cheniere Creole Trail Pipeline
Also calledCheniere Southern Trail Pipeline[1]
General information
KindPipeline project[2]
Project typeNew build[1][3]
StatusIn service[1][4]
CommodityNatural gas[1][3][5]
OperatorCheniere Creole Trail Pl Co[6][7] or Cheniere Energy[7] or Cheniere Creole Trail Pipeline, L.P.[7][sources disagree]
Owners and operators
Operator
Pipeline systemCheniere Creole Trail Pipeline[3][8]
StateLA[6][7] or AL, LA, MS[1][sources disagree]
CountiesCameron, LA[3][9] or Acadia, LA; Allen, LA; Beauregard, LA; Calcasieu, LA; Cameron, LA; Jefferson Davis, LA[5][sources disagree]
Approved15 June 2006[5][6][7] or 7 January 2005[7] or 16 March 2007[7][sources disagree]
Construction startedSeptember 2007[10]
In service22 June 2008[1]
FERC docketCP05-357[6]
FERC pre-filing docketPF05-8[6]
Louisiana coastal use permitsP20040708[7], P20061659[7]
Contractors
Technical information
Length134.9 mi[3][6] or 135 mi[1] or 18.1 mi[3][sources disagree]
Pipe size36", 42"[1] or 42"[7][sources disagree]
Capacity2000 MMcf/d (FERC project list)[1][6]
Cost$583 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Cheniere Creole Trail Pipeline is a natural gas pipeline. Construction began in 2007 and the line entered service in 2008.

Contractorsedit

ContractorWorkScopeSpreadYears
Sunland Construction, Inc.[10]PrimeSpread one, the first 18-mile 42-inch spreadfrom 1 September 2007
Sheehan Pipeline Construction Inc.[11]PrimeSegment 3A (alternate route, 42-inch single line option) under a construction agreement dated 2007-01-10Segment 3A
Sunland Construction, Inc.[12]PrimeCreole Trail Pipeline Segment 1 (Preferred Route Single Line Option) under the construction agreement dated 2007-03-12; Change Order 1 dated 2008-02-07 added a push site

Inspection

FirmScope
Providence Engineering and Environmental Group LLC[8]One-year post-construction restoration monitoring report, June 2010

Spreads

SpreadPrime contractor
Segment 3A[11]Sheehan Pipeline Construction Inc.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Approved
Counties
  • Cameron, LA[3][9]
  • Acadia, LA; Allen, LA; Beauregard, LA; Calcasieu, LA; Cameron, LA; Jefferson Davis, LA[5]
Pipe size
Length
Operator
  • Cheniere Creole Trail Pl Co[6][7]
  • Cheniere Energy[7]
  • Cheniere Creole Trail Pipeline, L.P.[7]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cheniere Creole Trail Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP05-357”. Federal Energy Regulatory Commission. 23 May 2005. Retrieved 3 October 2026.
  3. “Order amending certificate, Cheniere Creole Trail Pipeline, L.P., Docket CP05-357 (Segment 1)”. Federal Energy Regulatory Commission. 16 February 2007. Retrieved 3 October 2026.
  4. “Letter order authorizing Creole Trail Pipeline Segments 1, 2, part of 3 and the TETCO Lateral to be placed in service (CP05-357)”. FERC (Office of Energy Projects). 13 May 2008. Retrieved 4 October 2026.
  5. “Order granting Section 3 authority and issuing certificates, Creole Trail LNG, LP and Cheniere Creole Trail Pipeline, LP (CP05-360 et al.)”. FERC. 15 June 2006. Retrieved 4 October 2026.
  6. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  7. “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
  8. “Cheniere Creole Trail Pipeline, L.P., second quarter 2010 restoration report with one-year post-construction restoration monitoring reports, Docket CP05-357”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 14 July 2010. Retrieved 3 October 2026.
  9. “Sabine Pass LNG, L.P., implementation plan for Tank S-106, Docket CP05-396 (includes Cheniere letter of Nov. 13, 2009 to LDNR on CUP P20040708)”. Sabine Pass LNG, L.P. (filed with FERC). 28 June 2012. Retrieved 3 October 2026.
  10. “Cheniere Energy Awards Contracts, Begins Construction on Creole Trail Natural Gas Pipeline”. Industrial Info Resources. 19 October 2007. Retrieved 3 October 2026.
  11. “Change Orders 4-11 to the Creole Trail Pipeline Segment 3A construction agreement (Cheniere Creole Trail Pipeline, L.P. and Sheehan Pipe Line Construction Company)”. Cheniere Energy, Inc. (filed with the SEC). Retrieved 4 October 2026.
  12. “Change Order 1 to Construction Agreement dated March 12, 2007, Creole Trail Pipeline Segment 1 (Exhibit 10.95 to Cheniere Energy 10-K)”. Cheniere Energy, Inc. (filed with the SEC). 27 February 2008. Retrieved 6 October 2026.