Cheniere Creole Trail Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Cheniere Creole Trail Pipeline is a natural gas pipeline system in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 95.7 miles.

Cheniere Creole Trail Pipeline
Also called
  • Creole Pipeline Co[1]
General information
CommodityNatural gas[1]
JurisdictionIntrastate[1] or Interstate[2][sources disagree]
StatusIn service[1]
Operator
PHMSA operator ID32264[2]
StateLouisiana[2]
Technical information
Length95.7 mi[2]
On ProvenHand
Hands listed0

Cheniere Creole Trail Pipeline is a natural gas pipeline system in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 95.7 miles.

Projects

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Jurisdiction

References

  1. “EIA map layer: Natural Gas Interstate and Intrastate Pipelines (NaturalGas_Pipelines_US_202001)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
  3. “Order amending certificate, Cheniere Creole Trail Pipeline, L.P., Docket CP05-357 (Segment 1)”. Federal Energy Regulatory Commission. 16 February 2007. Retrieved 3 October 2026.
  4. “Cheniere Creole Trail Pipeline, L.P., second quarter 2010 restoration report with one-year post-construction restoration monitoring reports, Docket CP05-357”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 14 July 2010. Retrieved 3 October 2026.
  5. “Environmental Assessment, Natural Gas Pipeline Company of America, Docket CP08-114 (interconnect with Cheniere Creole Trail Pipeline)”. Federal Energy Regulatory Commission. 27 May 2008. Retrieved 3 October 2026.
  6. “Coastal Use Permit/Consistency Determination P20051399, Creole Trail LNG, L.P. and Cheniere Creole Trail Pipeline, L.P. (dockets CP05-357, CP05-360)”. Creole Trail LNG, L.P. and Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 28 March 2007. Retrieved 4 October 2026.
  7. “Cheniere Creole Trail Pipeline, L.P., Request for Prior Notice Authorization under blanket certificate (PSI Interconnect, Cameron Meadows Processing Plant)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 2 April 2010. Retrieved 3 October 2026.
  8. “Cheniere Creole Trail Pipeline, L.P., additional information on non-jurisdictional facilities for the Targa Interconnect, Docket CP08-445”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 29 July 2008. Retrieved 3 October 2026.