Cheniere Creole Trail Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Cheniere Creole Trail Pipeline is a natural gas pipeline system in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 95.7 miles.
| Cheniere Creole Trail Pipeline | |
|---|---|
| Also called |
|
| General information | |
| Commodity | Natural gas[1] |
| Jurisdiction | Intrastate[1] or Interstate[2][sources disagree] |
| Status | In service[1] |
| Operator | |
| PHMSA operator ID | 32264[2] |
| State | Louisiana[2] |
| Technical information | |
| Length | 95.7 mi[2] |
| On ProvenHand | |
| Hands listed | 0 |
Cheniere Creole Trail Pipeline is a natural gas pipeline system in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 95.7 miles.
Projects
| Project | Kind | Status | Built |
|---|---|---|---|
| Cheniere Creole Trail Pipeline[3][4] | Pipeline project | In service | 2007–2008 |
| Cheniere Creole Trail Pipeline coastal use permit P20070115 pipeline[5] | Pipeline project | ||
| Creole Trail Lng, LP And Cheniere Creole Trail Pipeline coastal use permit P20051399 pipeline[6] | Pipeline project | ||
| PSI Interconnect Project[7] | Pipeline project | ||
| Targa Interconnect[8] | Pipeline project |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
References
- “EIA map layer: Natural Gas Interstate and Intrastate Pipelines (NaturalGas_Pipelines_US_202001)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “Order amending certificate, Cheniere Creole Trail Pipeline, L.P., Docket CP05-357 (Segment 1)”. Federal Energy Regulatory Commission. 16 February 2007. Retrieved 3 October 2026.
- “Cheniere Creole Trail Pipeline, L.P., second quarter 2010 restoration report with one-year post-construction restoration monitoring reports, Docket CP05-357”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 14 July 2010. Retrieved 3 October 2026.
- “Environmental Assessment, Natural Gas Pipeline Company of America, Docket CP08-114 (interconnect with Cheniere Creole Trail Pipeline)”. Federal Energy Regulatory Commission. 27 May 2008. Retrieved 3 October 2026.
- “Coastal Use Permit/Consistency Determination P20051399, Creole Trail LNG, L.P. and Cheniere Creole Trail Pipeline, L.P. (dockets CP05-357, CP05-360)”. Creole Trail LNG, L.P. and Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 28 March 2007. Retrieved 4 October 2026.
- “Cheniere Creole Trail Pipeline, L.P., Request for Prior Notice Authorization under blanket certificate (PSI Interconnect, Cameron Meadows Processing Plant)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 2 April 2010. Retrieved 3 October 2026.
- “Cheniere Creole Trail Pipeline, L.P., additional information on non-jurisdictional facilities for the Targa Interconnect, Docket CP08-445”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 29 July 2008. Retrieved 3 October 2026.