PSI Interconnect Project

From the ProvenHand pipeline wiki

PSI Interconnect Project is a natural gas pipeline in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 0.1 miles of 12" pipe.

PSI Interconnect Project
General information
KindPipeline project[1]
Project typeNew build[1]
CommodityNatural gas[1]
Owner and operator
Pipeline systemCheniere Creole Trail Pipeline[3]
StateLouisiana[2]
CountiesCameron[1]
Approved22 June 2010[2]
FERC docketCP10-118[4]
Louisiana coastal use permitP20100416[2]
Technical information
Length0.1 mi[3]
Pipe size12"[2]
Capacityup to 250 million cubic feet per day[3]
On ProvenHand
Hands listed0

PSI Interconnect Project is a natural gas pipeline in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It runs 0.1 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on PSI Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Cheniere Creole Trail Pipeline, L.P., Prior Notice - Coastal Use Permit Status Update, Docket CP10-118 (with LDNR public notice for CUP P20100416)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 26 May 2010. Retrieved 3 October 2026.
  2. “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
  3. “Cheniere Creole Trail Pipeline, L.P., Request for Prior Notice Authorization under blanket certificate (PSI Interconnect, Cameron Meadows Processing Plant)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 2 April 2010. Retrieved 3 October 2026.
  4. “Cheniere Creole Trail Pipeline, L.P., Coastal Use Permit submittal, Docket CP10-118 (with issued permit P20100416)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 16 August 2010. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.