FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)
From the ProvenHand pipeline wiki
FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida) is a pipeline replacement in Florida.
| FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Owner | |
| State | Florida[1] |
| Contractors | |
| Technical information | |
| Pipe size | 36"[1] |
| On ProvenHand | |
| Hands listed | 0 |
FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida) is a pipeline replacement in Florida.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Sunland Construction, Inc.[1] | Prime | Listed under 1999 Sunland Station Projects: 36-inch mainline replacement at C/S 15, Perry, FL, for Florida Gas Transmission | until 1 January 1999 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “1999 Sunland Station Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.