FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)

From the ProvenHand pipeline wiki

FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida) is a pipeline replacement in Florida.

FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)
General information
KindPipeline project[1]
Project typeReplacement[1]
Owner
StateFlorida[1]
Contractors
Technical information
Pipe size36"[1]
On ProvenHand
Hands listed0

FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida) is a pipeline replacement in Florida.

Contractorsedit

ContractorWorkScopeYears
Sunland Construction, Inc.[1]PrimeListed under 1999 Sunland Station Projects: 36-inch mainline replacement at C/S 15, Perry, FL, for Florida Gas Transmissionuntil 1 January 1999

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on FGT 36-inch Mainline Replacement at Compressor Station 15 (Perry, Florida)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “1999 Sunland Station Projects (partial listing of completed projects)”. Sunland Construction, Inc. Archived from the original on 8 March 2001. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.