Highway 19 Relocation Project

From the ProvenHand pipeline wiki

Highway 19 Relocation Project is a natural gas pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2010. It runs 2.6 miles of 4", 10", 12" pipe.

Highway 19 Relocation Project
Also calledSt. Petersburg Lateral / Clearwater South Lateral Replacement Project[1]
General information
Project typeReplacement[2]
CommodityNatural gas[2]
Owner and operator
StateFlorida[2]
CountiesPinellas[2]
Construction startedMarch 2010[4]
FERC docketCP10-12[3]
Contractors
Technical information
Length2.6 mi[2]
Pipe size4", 10", 12"[2]
Cost$19.5 million[2]
On ProvenHand
Hands listed0

Highway 19 Relocation Project is a natural gas pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2010. It runs 2.6 miles of 4", 10", 12" pipe.

Contractorsedit

ContractorWorkScope
Sunland Construction, Inc.[4]PrimeFGT's contractor for the Highway 19 relocation of the St. Petersburg Lateral (mobilized March 22, 2010)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Highway 19 Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Compliance Inspection Report, St. Petersburg Lateral / Clearwater South Lateral Replacement Project (CP10-12)”. FERC. 9 November 2011. Retrieved 4 October 2026.
  2. “Notice of request under blanket authorization, Florida Gas Transmission Company, LLC (CP10-12)”. FERC. 9 November 2009. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP10-12”. Federal Energy Regulatory Commission. 29 October 2009. Retrieved 3 October 2026.
  4. “Weekly Environmental Status Report No. 1, Florida Gas Transmission Company, LLC (CP10-12)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 April 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.