Elba Express Interconnects Project
From the ProvenHand pipeline wiki
Elba Express Interconnects Project is a natural gas facility project in Georgia and South Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2009.
| Elba Express Interconnects Project | |
|---|---|
| Also called | Elba Express Pipeline Interconnect Project[1] |
| General information | |
| Kind | Facility project[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | Georgia, South Carolina[3] |
| Counties | Georgia: Hart South Carolina: Anderson[3] |
| Approved | 17 September 2009[5] |
| Construction started | 12 October 2009[1] |
| FERC docket | CP09-88[4] |
| Contractors | |
| Technical information | |
| Cost | approximately $25.3 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
Elba Express Interconnects Project is a natural gas facility project in Georgia and South Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2009.
Contractorsedit
| Contractor | Work | Prime or sub | Scope |
|---|---|---|---|
| Sunland Construction, Inc.[1] | Prime | Interconnect construction at the Georgia and South Carolina meter sites: welding, excavation, hydrostatic test and tie-in (construction progress reports, Oct to Nov 2009) | |
| Miller Grading Co.[1] | Clearing and reclamation | Under Sunland Construction, Inc. | Tree removal and grading at the Georgia and South Carolina meter sites |
| Infrasource Construction Services[1] | Site preparation (office entrance and laydown yard) | Built the office site entrance and laydown yard (October 2009) | |
| Little River[1] | Erosion control (silt fence) | Under Infrasource Construction Services | Silt fence installation at the office entrance and laydown yard, Infrasource's environmental subcontractor |
| DSC Asbestos Removal Inc.[1] | Asbestos removal (pipe coating) | Asbestos contractor named in the construction progress report (Oct to Nov 2009) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Elba Express Interconnects Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Construction Progress Report for 10/12/2009 through 11/14/2009, Elba Express Pipeline Interconnect Project, Transcontinental Gas Pipe Line Company, LLC (CP09-88)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 November 2009. Retrieved 4 October 2026.
- “Supplemental cost information, Elba Express Interconnects Project, Transcontinental Gas Pipe Line Company, LLC (CP09-88)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 22 April 2009. Retrieved 4 October 2026.
- “Notice of request under blanket authorization, Transcontinental Gas Pipe Line Company, LLC (CP09-88)”. FERC. 14 April 2009. Retrieved 4 October 2026.
- “FERC eLibrary docket CP09-88”. Federal Energy Regulatory Commission. 31 March 2009. Retrieved 3 October 2026.
- “Order denying protest and authorizing construction, Transcontinental Gas Pipe Line Company, LLC (CP09-88)”. FERC. 17 September 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.