Line 1 Replacement Project is a pipeline replacement in South Carolina, operated by Carolina Gas Transmission, LLC. It was built and entered service in 2012. It runs 7.6 miles of 16" pipe.
| Line 1 Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Owner and operator | |
| State | South Carolina[3] |
| Counties | Aiken[3] |
| Construction started | June 2012[4] |
| In service | 1 November 2012[2] |
| FERC docket | CP12-101[1] |
| Contractors | |
| Technical information | |
| Length | 7.6 mi[5] |
| Pipe size | 16"[5] |
| Cost | $15,005,104.82[5] |
| On ProvenHand | |
| Hands listed | 0 |
Line 1 Replacement Project is a pipeline replacement in South Carolina, operated by Carolina Gas Transmission, LLC. It was built and entered service in 2012. It runs 7.6 miles of 16" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Sunland Construction, Inc.[4] | Prime |
| Geosyntec Consultants, Inc.[4] | environmental consulting firm |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 1 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP12-101”. Federal Energy Regulatory Commission. 3 April 2012. Retrieved 3 October 2026.
- “Status report, December 4 to 16, 2012, Line 1 Replacement Project (CP12-101)”. Carolina Gas Transmission Corporation (filed with FERC). 21 December 2012. Retrieved 4 October 2026.
- “FERC notice of request under blanket authorization, Line 1 replacement, Aiken County (CP12-101)”. FERC. 13 April 2012. Retrieved 4 October 2026.
- “Weekly Report No. 1, June 18 to 24, 2012, Line 1 Replacement Project (CP12-101)”. Carolina Gas Transmission Corporation (filed with FERC). 29 June 2012. Retrieved 4 October 2026.
- “Environmental Assessment Report, Line 1 replacement, Aiken County (CP12-101)”. FERC. 14 June 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.