Coastal Bend Header
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Coastal Bend Header is a natural gas pipeline lateral in Texas, operated by Boardwalk Pipeline Partners. Construction began in 2017.[1]
| Coastal Bend Header | |
|---|---|
| Also called | Coastal Bend Header Project, Gulf South Coastal Bend Header, 1.42 Billion cubic feet per day Coastal Bend Header Project[6] |
| General information | |
| Project type | Lateral[7] |
| Status | In service[7] |
| Commodity | Natural gas[7][8] |
| Operator | Boardwalk Pipeline Partners |
| Owner and operator | |
| Facility projects | |
| State | Texas[7][10] |
| Counties | Brazoria, Wharton[4][8] |
| Announced | September 2014[12] |
| Approved | 20 June 2016[8][10] |
| Construction started | 2017 |
| In service | April 2018[7] or November 2018[9][sources disagree] |
| FERC docket | CP15-517[10] |
| FERC pre-filing docket | PF15-4[10] |
| Contractors | |
| Technical information | |
| Length | 65 mi[7] or 66 mi[8][10][sources disagree] |
| Pipe size | 36" |
| Diameters | 36 and 42 in[7][8] |
| Capacity | 1420 MMcf/d (FERC project list)[10] or 1400 MMcf/d additional capacity (EIA)[7] or up to 1.42 Bcf/d (FERC order)[8][sources disagree] |
| Cost | $545 million (EIA estimate; no dollar year given)[7][8] |
| On ProvenHand | |
| Hands listed | 0 |
Coastal Bend Header is a natural gas pipeline lateral in Texas, operated by Boardwalk Pipeline Partners. Construction began in 2017.[1]
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Sunland Construction[4] | pipeline construction | |
| Sunland Construction, Inc.[4][13][14] | Prime | Listed 2017 as contractor: 66 miles of 36-inch, three compressor stations and seven meter stations in Wharton and Brazoria counties, TX |
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 1[15] | Sunland Construction, Inc. |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Coastal Bend Header? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- sec.gov · bwp10kq42016.htm
- sec.gov
- sec.gov
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- s3.amazonaws.com · Ongoing.pdf
- “FERC eLibrary docket CP15-517”. Federal Energy Regulatory Commission. 12 June 2015. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Gulf South Pipeline Company, LP, Coastal Bend Header Project (CP15-517)”. FERC. 20 June 2016. Retrieved 4 October 2026.
- “Boardwalk Pipelines: Our purpose (company history)”. Boardwalk Pipelines. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary filing 20170524-3021”. Federal Energy Regulatory Commission. Retrieved 4 October 2026.
- “Boardwalk pipeline to supply Freeport LNG project”. Houston Chronicle. 11 September 2014. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, June 2018)”. Pipeline News. June 2018. Retrieved 3 October 2026.
- “Environmental Compliance Monitoring Program Weekly Summary Report (Feb 20-25, 2017), Coastal Bend Header Project (CP15-517)”. FERC (third-party compliance monitoring report). 13 March 2017. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.