Coastal Bend Header is a natural gas pipeline lateral in Texas, operated by Boardwalk Pipeline Partners. Construction began in 2017.[1]

Coastal Bend Header
Also calledCoastal Bend Header Project, Gulf South Coastal Bend Header, 1.42 Billion cubic feet per day Coastal Bend Header Project[6]
General information
Project typeLateral[7]
StatusIn service[7]
CommodityNatural gas[7][8]
OperatorBoardwalk Pipeline Partners
Owner and operator
Facility projects
StateTexas[7][10]
CountiesBrazoria, Wharton[4][8]
AnnouncedSeptember 2014[12]
Approved20 June 2016[8][10]
Construction started2017
In serviceApril 2018[7] or November 2018[9][sources disagree]
FERC docketCP15-517[10]
FERC pre-filing docketPF15-4[10]
Contractors
Technical information
Length65 mi[7] or 66 mi[8][10][sources disagree]
Pipe size36"
Diameters36 and 42 in[7][8]
Capacity1420 MMcf/d (FERC project list)[10] or 1400 MMcf/d additional capacity (EIA)[7] or up to 1.42 Bcf/d (FERC order)[8][sources disagree]
Cost$545 million (EIA estimate; no dollar year given)[7][8]
On ProvenHand
Hands listed0

Coastal Bend Header is a natural gas pipeline lateral in Texas, operated by Boardwalk Pipeline Partners. Construction began in 2017.[1]

Contractorsedit

ContractorWorkScope
Sunland Construction[4]pipeline construction
Sunland Construction, Inc.[4][13][14]PrimeListed 2017 as contractor: 66 miles of 36-inch, three compressor stations and seven meter stations in Wharton and Brazoria counties, TX

Spreads

SpreadPrime contractor
Spread 1[15]Sunland Construction, Inc.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1420 MMcf/d (FERC project list)[10]
  • 1400 MMcf/d additional capacity (EIA)[7]
  • up to 1.42 Bcf/d (FERC order)[8]
In service
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Coastal Bend Header? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. sec.gov · bwp10kq42016.htm
  2. sec.gov
  3. sec.gov
  4. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  5. s3.amazonaws.com · Ongoing.pdf
  6. “FERC eLibrary docket CP15-517”. Federal Energy Regulatory Commission. 12 June 2015. Retrieved 3 October 2026.
  7. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  8. “Order Issuing Certificate, Gulf South Pipeline Company, LP, Coastal Bend Header Project (CP15-517)”. FERC. 20 June 2016. Retrieved 4 October 2026.
  9. “Boardwalk Pipelines: Our purpose (company history)”. Boardwalk Pipelines. Retrieved 4 October 2026.
  10. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  11. “FERC eLibrary filing 20170524-3021”. Federal Energy Regulatory Commission. Retrieved 4 October 2026.
  12. “Boardwalk pipeline to supply Freeport LNG project”. Houston Chronicle. 11 September 2014. Retrieved 4 October 2026.
  13. “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
  14. “Ongoing Projects: Construction Underway (Pipeline News, June 2018)”. Pipeline News. June 2018. Retrieved 3 October 2026.
  15. “Environmental Compliance Monitoring Program Weekly Summary Report (Feb 20-25, 2017), Coastal Bend Header Project (CP15-517)”. FERC (third-party compliance monitoring report). 13 March 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.