Rover Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Rover Pipeline is a natural gas pipeline in Ohio, Michigan, West Virginia and Pennsylvania. Construction began in 2017 and the line entered service in 2018.[1]

Rover Pipeline
Also calledRover, ET Rover, ETC Rover
General information
StatusIn service[8]
CommodityNatural gas
OperatorEnergy Transfer[9] or Rover Pipeline LLC[9][sources disagree]
Owner and operator
Facility projects
StatesOhio, Michigan, West Virginia, Pennsylvania[9]
Approved2 February 2017[9]
Construction started4 March 2017[13]
In service3 November 2018[8]
FERC docketCP15-93[9]
FERC pre-filing docketPF14-14[9]
Contractors
Technical information
Length713 mi[9] or 511.5 mi[9][sources disagree]
Pipe size24", 30", 36", 42"[14]
Capacity3250 MMcf/d (FERC project list)[9]
On ProvenHand
Hands listed0

Rover Pipeline is a natural gas pipeline in Ohio, Michigan, West Virginia and Pennsylvania. Construction began in 2017 and the line entered service in 2018.[1]

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Sheehan Pipe Line Construction[2]Spreads 1-2, Mainlines A and B (42-inch)
U.S. Pipeline[2]Spread 3, Mainlines A and B; Cadiz and Clarington laterals
Michels[2]Spread 4, Mainlines A and B; Burgettstown Lateral
Precision Pipeline[2]Spreads 5-8 (mainline and Market Segment); Berne, Majorsville, Sherwood and CGT laterals
Latex Construction[2]Seneca Lateral
Pretec Directional Drilling[7]HDD
Mears Group[7]HDD
Laney Directional Drilling[7]HDD
Atlas Trenchless[7]HDD
B&T Directional Drilling[7]HDD
Hoover Construction Company[15]Rock drilling and blastingPipeline rock drilling and blasting1 January 2017
Precision Pipeline, LLC[14][16]PrimeSpreads A-D, 7, 8, Seneca, Sherwood and Majorsville: 187.3 mi dual 42-in, 126.3 mi single 42-in, 54.0 mi 36-in, 33.7 mi 24-in (OH, MI, WV)until 1 January 2017
The HDD Company, Inc.[17]HDD and boreOne of several drilling contractors: 12 horizontal directional drill crossings in Ohio (rail lines, rivers, roadways) of the parallel 42-inch lines, the majority of the project's crossings
Atlas Trenchless, LLC[18]HDD and boreSandy Creek A&B and I-77 A&B, Ohio: 8,503 LF of 42-inch steel pipe in rock
Atlas Trenchless, LLC[19]HDD and borePortage River, Michigan: 2,500 LF of 42-inch steel pipe in rock
Atlas Trenchless, LLC[20]HDD and boreWolf Creek Line B, Ohio: 2,200 LF of 42-inch steel pipe in rock
Milbar Hydro-Test, Inc.[21]HydrotestPre-cleaning, filling, hydrotesting, caliper pig run and dew point drying: 128 miles of 30-, 36- and 42-inch (firm's figures)
AECOM[14]front-end engineering and designFront-end engineering and design (listed 2017)
Ariel Corp.[14]compressor supplyCompressor supply, $42 million (listed 2017)
Sheehan Pipeline Construction Inc.[14]PrimeSpreads 1 and 2, Mainlines A and B: 78 miles of 42-inch in Carroll to Defiance counties, OH (listed 2017)
U.S. Pipeline, Inc.[14]PrimeSpread 3, Mainlines A and B (70 miles of 42-inch); Cadiz Lateral (3 miles of 30-inch) and Clarington Lateral (32.6 miles of 42-inch) (listed 2017)
Michels[14]PrimeSpread 4, Mainlines A and B (101 miles of 42-inch); Burgettstown Lateral (52 miles of 36-inch) (listed 2017)
Latex Construction[14]PrimeSeneca Lateral: 26 miles of 42-inch in Noble and Monroe counties, OH (listed 2017)
Price Gregory International, LLC[22]right-of-way felling contract (per subcontractor entry)Listed 2017 as the contractor over Pedero's hand felling of 292 miles of 42-inch right-of-way in Ohio and Michigan
Pedero Pipe Support Systems USA[22]Clearing and reclamationUnder Price Gregory International, LLCHand felling of 292 miles of 42-inch right-of-way in Ohio and Michigan, for Price Gregory (listed 2017)
Precision Pipeline, LLC[23]PrimeSpreads 5 and 6, Mainlines A and B: 208 miles of 42-inchSpread 5
Precision Pipeline, LLC[23]PrimeSpreads 5 and 6, Mainlines A and B: 208 miles of 42-inchSpread 6
Precision Pipeline, LLC[23]PrimeSpreads 7 and 8, Market Segment pipeline: 99 miles of 42-inch in Defiance, Henry and Fulton Counties, OH, and Lenawee, Washtenaw and Livingston Counties, MISpread 7
Precision Pipeline, LLC[23]PrimeSpreads 7 and 8, Market Segment pipeline: 99 miles of 42-inch in Defiance, Henry and Fulton Counties, OH, and Lenawee, Washtenaw and Livingston Counties, MISpread 8
Precision Pipeline, LLC[23]PrimeBerne Lateral: 3.7 miles of 24-inch supply lateral, Noble and Monroe Counties, OHBerne Lateral
Precision Pipeline, LLC[23]PrimeMajorsville Lateral: 24 miles of 24-inch supply lateral, Marshall County, WV, and Belmont County, OHMajorsville Lateral
Precision Pipeline, LLC[23]PrimeSherwood Lateral: 54 miles of 36-inch supply lateral, Doddridge, Tyler and Wetzel Counties, WV, and Monroe County, OHSherwood Lateral
Precision Pipeline, LLC[23]PrimeCGT Lateral: 5.7 miles of 24-inch supply lateral, Doddridge County, WVCGT Lateral

Inspection

FirmScope
Cardno, Inc.[24]FERC third-party environmental compliance monitoring (team began work February 2017); prepared the program's close-out report (August 2020)

NDT

FirmYears
JAN X-Ray Services Inc.[25]from 1 January 2017

Pipe mills

Spreads

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length
Operator
  • Energy Transfer[9]
  • Rover Pipeline LLC[9]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rover Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. s3.amazonaws.com · Ongoing_Projects.pdf
  2. s3.amazonaws.com · PLN0718_ongoing.pdf
  3. ferc.gov
  4. worldpipelines.com
  5. precisionpipelinellc.com
  6. sec.gov · et12-31x201810k.htm
  7. caselaw.findlaw.com · 2036289.html
  8. “Notice of Commencement of Service of the CGT Lateral, Rover Pipeline Project (CP15-93)”. Rover Pipeline LLC (filed with FERC). 19 November 2018. Retrieved 4 October 2026.
  9. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  10. “Letter order granting Rover Pipeline LLC's 5/07/18 request to commence service of the Majorsville Lateral and Compressor Station for the Rover Pipeline Project (CP15-93)”. FERC (eLibrary filing description). 23 August 2018. Retrieved 4 October 2026.
  11. “Letter order granting Rover Pipeline, LLC's request to commence partial service of the Rover Pipeline Project (CP15-93)”. Federal Energy Regulatory Commission. 31 August 2017. Retrieved 4 October 2026.
  12. “Letter order granting Rover Pipeline, LLC's request to commence service of the Supply Connector B pipeline segment and full service of Mainline B (CP15-93)”. Federal Energy Regulatory Commission. 31 May 2018. Retrieved 4 October 2026.
  13. “Notice of Commencement of Construction, Rover, Panhandle Backhaul and Trunkline Backhaul Projects (CP15-93, CP15-94, CP15-96)”. Rover Pipeline LLC et al. (filed with FERC). 14 March 2017. Retrieved 4 October 2026.
  14. “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
  15. “2017 Rover Pipeline – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
  16. “All Projects - Precision Pipeline, LLC | Infrastructure and Utility Pipeline Contractor”. Precision Pipeline, LLC. Retrieved 3 October 2026.
  17. “Case study: Rover Pipeline”. The Crossing Group (The HDD Company). Retrieved 3 October 2026.
  18. “Project Experience: 41703-41706 Sandy Creek A&B Rov I-77 A&B (page address names Energy Transfer Co. Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  19. “Project Experience: 41723 Portage River 42-inch Project (page address names Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  20. “Project Experience: 41724 Wolf Creek Line B (page address names ETC Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  21. “ETC - Rover Projects (project page)”. Milbar Hydro-Test, Inc. Retrieved 3 October 2026.
  22. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  23. “Ongoing Projects: Construction Underway (Pipeline News, May 2018)”. Pipeline News. May 2018. Retrieved 3 October 2026.
  24. “Environmental Compliance Monitoring Program Close Out Report, Rover Pipeline Project (CP15-93)”. Federal Energy Regulatory Commission (report prepared by Cardno). 16 October 2025. Retrieved 4 October 2026.
  25. “JANX Pipeline Projects & Case Studies (Wayback capture of 2018-12-14)”. JANX. Archived from the original on 14 December 2018. Retrieved 3 October 2026.
  26. “Borusan Berg Pipe - Selected Projects”. Borusan Berg Pipe. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.