AECOM
From the ProvenHand pipeline wiki
AECOM is a pipeline contractor.
| AECOM | |
|---|---|
| General information | |
| Industry | |
| PLCA | Not a PLCA member as of 3 October 2026[4] |
| On ProvenHand | |
| Hands listed | 0 |
AECOM is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Project built |
|---|---|---|---|
| Longwall Mining Panel M1 Project[5] | permitting (named with Texas Eastern on the notice of the project's Joint Permit Application) | Notice of the Joint Permit Application for the Longwall Mining Panel M1 Project, Richhill and Center Townships, Greene County PA (county minutes, April 2025) | 2026 |
| Rover Pipeline[1] | front-end engineering and design | Front-end engineering and design (listed 2017) | 2017–2018 |
| Gulf Markets Expansion Project[2] | Environmental consultant (nesting bird surveys) | Nesting bird surveys before construction mobilization at the Wheelersburg, Egypt and Opelousas compressor stations | 2016–2017 |
| Sunbury Pipeline Project[6] | Environmental consultant (post-construction wetland monitoring) | Took part in the 2018 post-construction wetland and waterbody field investigations with UGI and the Corps (Corps file CENAB-OPR-P 2015-00609-P12) | 2016–2017 |
| 1.1 Mile Pipe Replacement - Mercer Co.[3] | environmental survey (pedestrian survey of the replacement line, hired by the operator) |
References
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Monthly Status Report No. 1 (period ending Feb 20, 2016), Gulf Markets Expansion Project (CP15-90)”. Texas Eastern Transmission, LP (filed with FERC). 26 February 2016. Retrieved 3 October 2026.
- “Certification regarding exclusion and avoidance areas, Dakota Gasification Company replacement of 1.1 miles of synthetic natural gas pipeline, PU-16-018”. Dakota Gasification Company (filed with the North Dakota Public Service Commission). 7 January 2016. Retrieved 3 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Commissioners Agenda Meeting Minutes, April 16, 2025 (Notices)”. Greene County, Pennsylvania, Board of Commissioners. 16 April 2025. Retrieved 4 October 2026.
- “Copy of Corps of Engineers letter on completion of permit monitoring, Sunbury Pipeline Project (CP15-525)”. UGI Sunbury, LLC (filed with FERC). 8 April 2020. Retrieved 3 October 2026.