Atlas Trenchless, LLC

From the ProvenHand pipeline wiki

Atlas Trenchless, LLC is a pipeline contractor based in Cold Spring, Minnesota.

Atlas Trenchless, LLC
General information
Industry
StatusActive[4]
HeadquartersCold Spring, Minnesota[4]
Websitewww.atlas-trenchless.com[1]
PLCAMember as of 3 October 2026[1]
On ProvenHand
Hands listed0

Atlas Trenchless, LLC is a pipeline contractor based in Cold Spring, Minnesota.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeSpreadProject built
Northern Lights 2023 Expansion[5]HDD and boreConventional road bore P4-1 under Huntington Way (Willmar D branch line extension)Willmar D branch line extension (24-inch)2024
Millennium Pipeline Eastern System Upgrade[6]HDD and boreI-84 and Rutgers Creek, New York: 5,800 LF of 36-inch steel pipe in rock2017–2019
Rover Pipeline[7]HDD and boreSandy Creek A&B and I-77 A&B, Ohio: 8,503 LF of 42-inch steel pipe in rock2017–2018
Rover Pipeline[8]HDD and borePortage River, Michigan: 2,500 LF of 42-inch steel pipe in rock2017–2018
Rover Pipeline[9]HDD and boreWolf Creek Line B, Ohio: 2,200 LF of 42-inch steel pipe in rock2017–2018
Auburn Line Extension Project[10]HDD and boreHorizontal directional drilling: 1,205 LF of 20-inch steel pipe in rock conditions, Wyoming Co., PA2014

References

  1. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  2. “Project Experience: 41307 Enterprise Front Range Segment 3 Pipeline (Wayback capture 2022-07-01)”. Atlas Trenchless, LLC. Archived from the original on 1 July 2022. Retrieved 3 October 2026.
  3. “Project Experience: 41309 Enterprise Front Range Segment 2 Pipeline (Wayback capture 2022-07-01)”. Atlas Trenchless, LLC. Archived from the original on 1 July 2022. Retrieved 3 October 2026.
  4. “Atlas Trenchless home page”. Atlas Trenchless, LLC. Retrieved 3 October 2026.
  5. “Weekly Environmental Inspector Report No. 10 (Jul 8 to Jul 14, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 17 July 2024. Retrieved 3 October 2026.
  6. “Project Experience: 41802-41803 Upgrade I-84 & Rutgers Creek (page address names Millennium Eastern System Upgrade) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  7. “Project Experience: 41703-41706 Sandy Creek A&B Rov I-77 A&B (page address names Energy Transfer Co. Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  8. “Project Experience: 41723 Portage River 42-inch Project (page address names Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  9. “Project Experience: 41724 Wolf Creek Line B (page address names ETC Rover) (Wayback capture 2022-10-02)”. Atlas Trenchless, LLC. Archived from the original on 2 October 2022. Retrieved 3 October 2026.
  10. “Projects, page 7”. Atlas Trenchless, LLC. Retrieved 3 October 2026.