Northern Lights 2023 Expansion is a natural gas pipeline expansion in Minnesota and Wisconsin, operated by Northern Natural Gas Company. Construction began in 2024.

Northern Lights 2023 Expansion
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owner and operator
StatesMinnesota, Wisconsin[2][4]
CountiesMinnesota: Freeborn, Scott, Sherburne, Stearns, Washington
Wisconsin: Monroe
[5]
Approved25 September 2023[4][6]
Construction started13 May 2024[7]
In service20 October 2024[2] or 31 October 2024[3][sources disagree]
FERC docketCP22-138[1]
Contractors
Technical information
Length9.4 mi[2][4] or 9.8 mi[6][sources disagree]
Pipe size8 in, 20 in, 24 in, 30 in, 36 in[2] or 4 in, 8 in, 24 in, 30 in, 36 in[6][sources disagree]
Capacity50.89 MMcf/d (FERC project list)[4] or 50.9 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$48.7 million (EIA estimate; no dollar year given)[2] or $48,695,000 estimated (certificate order)[6][sources disagree]
On ProvenHand
Hands listed0

Northern Lights 2023 Expansion is a natural gas pipeline expansion in Minnesota and Wisconsin, operated by Northern Natural Gas Company. Construction began in 2024.

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Eagan, Field, and Nowac, Inc.[5]SurveySurvey staking of staging yard and workspaces (Ventura North E-line, Willmar D branch line)from 1 May 2024
Michels Pipeline, Inc.[7]PrimeConstructed the Elk River 3rd branch line loop and Hugo launcher (30-inch, Segment 2)Elk River 3rd branch line loop (30-inch)from 13 May 2024
Michels Pipeline, Inc.[7]PrimeConstructed the Paynesville 2nd branch line (4-inch, Segment 5)Paynesville 2nd branch line (4-inch)from 13 May 2024
Michels Pipeline, Inc.[7]PrimeConstructed the Tomah branch line loop (8-inch, Segment 6)Tomah branch line loop (8-inch)from 13 May 2024
Lake Superior Consulting, LLC[5]Underground utility locatingUnderground utility locating on the Ventura North E-line extensionVentura North E-line extension (36-inch)from 18 May 2024
Otis Minnesota Services[7]PrimeConstructed the Ventura North E-line extension (36-inch, Segment 1)Ventura North E-line extension (36-inch)from 20 May 2024
Charps[7]PrimeConstructed the Willmar D branch line extension (24-inch, Segment 3)Willmar D branch line extension (24-inch)from 20 May 2024
Michels Pipeline, Inc.[7]PrimeConstructed the Princeton tie-over loop (8-inch, Segment 4)Princeton tie-over loop (8-inch)from 17 June 2024
Maxx HDD, LLC[8]HDD and boreUnder CharpsHDD WIL P4-2 and WIL P4-3 on the Willmar D branch line extensionWillmar D branch line extension (24-inch)from 1 July 2024
Atlas Trenchless, LLC[7]HDD and boreConventional road bore P4-1 under Huntington Way (Willmar D branch line extension)Willmar D branch line extension (24-inch)

Spreads

SpreadPrime contractorDates
Elk River 3rd branch line loop (30-inch)[5][7]Michels Pipeline, Inc.from 13 May 2024
Paynesville 2nd branch line (4-inch)[5][7]Michels Pipeline, Inc.from 13 May 2024
Princeton tie-over loop (8-inch)[5][7]Michels Pipeline, Inc.from 17 June 2024
Tomah branch line loop (8-inch)[5][7]Michels Pipeline, Inc.from 13 May 2024
Ventura North E-line extension (36-inch)[5][7]Otis Minnesota Servicesfrom 20 May 2024
Willmar D branch line extension (24-inch)[5][7]Charpsfrom 20 May 2024

Crossings

FeatureMethodContractorDates
ERT P4-2, Elk River loop (MP 0.3-0.5): roads and wetlands[7][9][10]HDDMichels Pipeline, Inc.6 June 2024 – 25 June 2024
ERT P4-3, Elk River loop (MP 0.7-1.0): open water[7][9]HDDMichels Pipeline, Inc.
PRB P4-1, Princeton loop (MP 8.8): 281st Avenue NW[9]HDD
PRB P4-2, Princeton loop (MP 9.2-9.6): 275th Avenue NW, wetland and waterbody[9][11]HDDMichels Pipeline, Inc.
PRB P4-5, Princeton loop (MP 9.9-10.1): wetlands[9]HDD
PRB P4-6, Princeton loop (MP 10.3-10.4): 269th Avenue NW[9]HDD
PRB P4-7, Princeton loop (MP 10.8-11.0): 265th Avenue NW and 264th Avenue[7][9][12]HDDMichels Pipeline, Inc.
TBL P4-1, Tomah loop (MP 1.9-2.0): County Highway B[9][13]HDDMichels Pipeline, Inc.
WIL P4-2, Willmar D extension (MP 2.4-2.5): wetland[9][12][14]HDDMaxx HDD, LLC
WIL P4-3, Willmar D extension (MP 2.5-3.0): Lynn Drive, driveways, wetland and waterbody[9][15]HDDMaxx HDD, LLC

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 50.89 MMcf/d (FERC project list)[4]
  • 50.9 MMcf/d additional capacity (EIA)[2]
Cost
  • $48.7 million (EIA estimate; no dollar year given)[2]
  • $48,695,000 estimated (certificate order)[6]
Diameters
  • 8 in, 20 in, 24 in, 30 in, 36 in[2]
  • 4 in, 8 in, 24 in, 30 in, 36 in[6]
In service
  • 20 October 2024[2]
  • 31 October 2024[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northern Lights 2023 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-138”. Federal Energy Regulatory Commission. 28 March 2022. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of in-service (Princeton, Willmar D, Ventura North E-line), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 31 October 2024. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Weekly Environmental Inspector Report No. 2 (May 13 to May 19, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 24 May 2024. Retrieved 3 October 2026.
  6. “Order Issuing Certificate, Northern Lights 2023 Expansion (CP22-138)”. Federal Energy Regulatory Commission. 25 September 2023. Retrieved 3 October 2026.
  7. “Weekly Environmental Inspector Report No. 10 (Jul 8 to Jul 14, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 17 July 2024. Retrieved 3 October 2026.
  8. “Weekly Environmental Inspector Report No. 11 (Jul 15 to Jul 21, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 24 July 2024. Retrieved 3 October 2026.
  9. “Final Environmental Impact Statement, Northern Lights 2023 Expansion (CP22-138)”. Federal Energy Regulatory Commission. 10 March 2023. Retrieved 3 October 2026.
  10. “Weekly Environmental Inspector Report No. 8 (Jun 24 to Jun 30, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 5 July 2024. Retrieved 3 October 2026.
  11. “Weekly Environmental Inspector Report No. 15 (Aug 12 to Aug 18, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 21 August 2024. Retrieved 3 October 2026.
  12. “Implementation Plan and Request for Notice to Proceed, Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 15 November 2023. Retrieved 3 October 2026.
  13. “Weekly Environmental Inspector Report No. 5 (Jun 3 to Jun 9, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 12 June 2024. Retrieved 3 October 2026.
  14. “Weekly Environmental Inspector Report No. 13 (Jul 29 to Aug 4, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 7 August 2024. Retrieved 3 October 2026.
  15. “Weekly Environmental Inspector Report No. 14 (Aug 5 to Aug 11, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 14 August 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.