Charps
From the ProvenHand pipeline wiki
Charps is a pipeline contractor based in Clearbrook, Minnesota.
| Charps | |
|---|---|
| Legal name | Charps, LLC[1] |
| Formerly | |
| General information | |
| Industry | |
| Type | Private[1] |
| Status | Active[8] |
| Predecessor | |
| Headquarters | Clearbrook, Minnesota, US[10] |
| Regions | Midwest, Plains, Northeast[9] |
| Website | www.charps.com[5] |
| PLCA | Member as of 3 October 2026[5] |
| On ProvenHand | |
| Hands listed | 0 |
Charps is a pipeline contractor based in Clearbrook, Minnesota.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| Northern Lights 2023 Expansion[7] | Prime | Constructed the Willmar D branch line extension (24-inch, Segment 3) | Willmar D branch line extension (24-inch) | from 20 May 2024 | 2024 |
| Northern Natural Gas A-Line Replacement Project[6] | Prime | D-line extension (30-inch) | D-line extension | 2023 | |
| Northern Lights 2021 Expansion[11] | Prime | Carlton Interconnect Loop | 2021–2022 | ||
| Blue Water Energy Center Project[12] | Prime | Installation of two 12-inch meters, a launcher, a receiver and 1.25 miles of 24-inch lateral for Vector at East China, MI | 2021 | ||
| Frazee Compressor Station Project[13] | Fabrication | Turbine piping (2- to 16-inch) fabricated in the Clearbrook shop and installed at Frazee, Otter Tail County, MN; the union job report names ONEOK as the customer | |||
| Line 1200A Line Lowerings[14] | Prime | Removed about 5,050 feet of 26-inch pipe, installed new lowered pipe and hydrotested during an outage | |||
| Major Pipeline 6-inch Ithaca Lateral[15] | Prime | 16 miles of 6-inch lateral at Ithaca, MI (with two HDDs per the September/October 2019 report) | |||
| Springville Compressor Station Bi-directional Upgrade[16] | Prime | Multi-phase upgrades of the Springville gas compressor station (La Porte, Indiana) for bi-directional flow, including a new cooler; mechanical, civil, structural, electrical and instrumentation work in an active facility |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| Northern Lights 2021 Expansion | Carlton Interconnect Loop[11][17] | 22 June 2021 – 1 November 2021 |
| Northern Lights 2023 Expansion | Willmar D branch line extension (24-inch)[7][18] | from 20 May 2024 |
| Northern Natural Gas A-Line Replacement Project | D-line extension[6][19] | 31 July 2023 – 30 October 2023 |
References
- “Main Street Capital Corporation, Form 10-K for 2025, Consolidated Schedule of Investments (Charps, LLC, pipeline maintenance and construction)”. Main Street Capital Corporation (filed with the SEC). 27 February 2026. Retrieved 6 October 2026.
- “Blue Light Reports, November/December 2015 (job reports naming Charps Welding)”. Pipeliners Local Union 798. November 2015. Retrieved 6 October 2026.
- “Main Street Announces New Portfolio Investment (management-led buyout of Charps Welding & Fabricating, Inc.)”. Main Street Capital Corporation. 9 February 2017. Retrieved 6 October 2026.
- “Blue Light Reports, May/June 2016 (job reports naming Charps Welding & Fabrication, Inc.)”. Pipeliners Local Union 798. May 2016. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Bi-weekly Environmental Inspector Report No. 1, Ogden to Ventura A-line Capacity Replacement (CP22-42)”. Northern Natural Gas Company (filed with FERC). 2 August 2023. Retrieved 3 October 2026.
- “Weekly Environmental Inspector Report No. 10 (Jul 8 to Jul 14, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 17 July 2024. Retrieved 3 October 2026.
- “Charps home page”. Charps, LLC. Retrieved 3 October 2026.
- “Our History”. Charps, LLC. Retrieved 3 October 2026.
- “Contact Us”. Charps, LLC. Retrieved 3 October 2026.
- “Biweekly Environmental Inspector Report, Northern Lights 2021 Expansion Project (CP20-503)”. Northern Natural Gas Company (filed with FERC). 9 July 2021. Retrieved 3 October 2026.
- “Blue Light Reports, July/August 2020 (job reports: Charps, LLC, meters, launcher, receiver and 1.25 miles of 24-inch lateral for Vector at East China, MI)”. Pipeliners Local Union 798. July 2020. Retrieved 6 October 2026.
- “Blue Light Reports, January/February 2024 (job reports: Charps, LLC, turbine piping fabrication at Clearbrook and installation at Frazee, Otter Tail County, MN)”. Pipeliners Local Union 798. January 2024. Retrieved 6 October 2026.
- “Line 1200A Line Lowerings, case study”. Charps, LLC. August 2026. Retrieved 6 October 2026.
- “Blue Light Reports, May/June 2019 (job reports: Charps, LLC, 16 miles of 6-inch lateral for Major Pipeline LLC at Ithaca, MI)”. Pipeliners Local Union 798. May 2019. Retrieved 6 October 2026.
- “Springville Station construction case study (bi-directional upgrade and cooler, La Porte, Indiana)”. Charps, LLC. May 2026. Retrieved 6 October 2026.
- “Notice of in-service, Carlton Interconnect Loop, Northern Lights 2021 Expansion Project (CP20-503)”. Northern Natural Gas Company (filed with FERC). 2 November 2021. Retrieved 3 October 2026.
- “Weekly Environmental Inspector Report No. 2 (May 13 to May 19, 2024), Northern Lights 2023 Expansion (CP22-138)”. Northern Natural Gas Company (filed with FERC). 24 May 2024. Retrieved 3 October 2026.
- “Bi-weekly Environmental Inspector Report No. 11, Ogden to Ventura A-line Capacity Replacement (CP22-42)”. Northern Natural Gas Company (filed with FERC). 19 December 2023. Retrieved 3 October 2026.