Blue Water Energy Center Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Blue Water Energy Center Project is a natural gas pipeline lateral in Michigan, operated by Vector Pipeline L.P.. It entered service in 2021. It runs 1.2 miles of 24" pipe.

Blue Water Energy Center Project
Also calledBlue Water Energy Center (BWEC) Pipeline[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateMichigan[1][2]
Approved27 December 2019[1]
In service15 December 2021[2]
FERC docketCP20-4[1]
Contractors
Technical information
Length1.2 mi[1][2]
Pipe size24"[2]
Capacity525 MMcf/d (FERC project list)[1] or 180 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$21.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Blue Water Energy Center Project is a natural gas pipeline lateral in Michigan, operated by Vector Pipeline L.P.. It entered service in 2021. It runs 1.2 miles of 24" pipe.

Contractorsedit

ContractorWorkScope
Charps[3]PrimeInstallation of two 12-inch meters, a launcher, a receiver and 1.25 miles of 24-inch lateral for Vector at East China, MI

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 525 MMcf/d (FERC project list)[1]
  • 180 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Blue Water Energy Center Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Blue Light Reports, July/August 2020 (job reports: Charps, LLC, meters, launcher, receiver and 1.25 miles of 24-inch lateral for Vector at East China, MI)”. Pipeliners Local Union 798. July 2020. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.