TC Energy Line 8000 Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

TC Energy Line 8000 Replacement Project is a natural gas pipeline replacement. Construction began in 2019 and the line entered service in 2022. It runs 14.2 miles of 4", 12" pipe.

TC Energy Line 8000 Replacement Project
Also calledLine 8000 Replacement Project[1], Columbia Gas Transmission Line 8000 Replacement Project[2], TransCanada CPG8000 Replacement[3]
General information
KindPipeline project[1][3]
Project typeReplacement[1][2][3]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateMD[1][3] or MD, WV[4][sources disagree]
CountiesAllegany, MD[3] or Allegany, MD; Mineral, WV[3][4][sources disagree]
Approved17 January 2019[4]
Construction startedApril 2019[5]
In service12 August 2022[1]
FERC docketCP18-13[1]
Contractors
Technical information
Length14.2 mi[1]
Pipe size4", 12"[1]
On ProvenHand
Hands listed0

TC Energy Line 8000 Replacement Project is a natural gas pipeline replacement. Construction began in 2019 and the line entered service in 2022. It runs 14.2 miles of 4", 12" pipe.

Contractorsedit

ContractorWorkPrime or subScopeYears
Price Gregory International, LLC[6]Prime6.4 miles of 12-inch, Maryland1 April 2019 – 31 August 2019
Beeghly Tree, LLC[3]Clearing and reclamationUnder Price Gregory International, LLC37,000 feet of clearing and grubbing, erosion and sedimentation control, timber mat hauling and placement, airbridges and temporary stream crossings, Allegany County, MD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Counties
  • Allegany, MD[3]
  • Allegany, MD; Mineral, WV[3][4]
Operator
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TC Energy Line 8000 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP18-13”. Federal Energy Regulatory Commission. 3 November 2017. Retrieved 3 October 2026.
  3. “Beeghly Tree Recent Notable Projects”. Beeghly Tree, LLC. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Granting Abandonment, Columbia Gas Transmission, LLC (CP18-13, Line 8000 Replacement Project)”. FERC (order). 17 January 2019. Retrieved 4 October 2026.
  5. “Line 8000 Replacement Project FERC Status Report No. 4 (Apr 10-25, 2019)”. Columbia Gas Transmission, LLC (filed with FERC). 30 April 2019. Retrieved 4 October 2026.
  6. “Price Gregory Completed Projects - Five Years (2020 list)”. Price Gregory International, LLC. June 2020. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.