Sundance Trail Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Sundance Trail Expansion Project is a natural gas pipeline expansion, operated by Northwest Pipeline GP. It was built and entered service in 2010.

Sundance Trail Expansion Project
Also calledNWPL Sundance Trail Expansion[1], Northwest's Sundance Trail Expansion Project[2]
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[3]
CommodityNatural gas[3]
OperatorNorthwest Pipeline GP[1]
Owner and operator
Operator
Facility project
StatesCO, WY[1] or CO, UT, WY[3][sources disagree]
CountiesUtah: Uintah
Wyoming: Lincoln
[4]
Approved19 November 2009[1]
Construction started30 March 2010[5]
In serviceNovember 2010[3]
FERC docketCP09-415[1]
FERC pre-filing docketPF08-30[1]
Contractors
Technical information
Length15.5 mi[1] or 16 mi[3][sources disagree]
Pipe size30"[3]
Capacity150 MMcf/d (FERC project list)[1][3]
Cost$59.4 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

Sundance Trail Expansion Project is a natural gas pipeline expansion, operated by Northwest Pipeline GP. It was built and entered service in 2010.

Contractorsedit

ContractorWorkScopeYears
Price Gregory International, LLC[6]PrimeSundance Trail Pipeline: 15.5 miles of 30-inch, Wyominguntil 1 October 2010

Inspection

FirmScopeYears
Tetra Tech, Inc.[7]FERC's contractor for environmental compliance inspections during constructionfrom 1 September 2010

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Sundance Trail Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP09-415”. Federal Energy Regulatory Commission. 20 May 2009. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Granting Abandonment, Northwest Pipeline GP, Sundance Trail Expansion Project (CP09-415)”. Federal Energy Regulatory Commission. 19 November 2009. Retrieved 4 October 2026.
  5. “Biweekly Construction Report 1, Sundance Trail Expansion Project (CP09-415)”. Northwest Pipeline GP (filed with FERC). 15 April 2010. Retrieved 4 October 2026.
  6. “Price Gregory Completed Projects - Five Years (2016 list)”. Price Gregory International, LLC. 9 May 2016. Archived from the original on 9 May 2016. Retrieved 3 October 2026.
  7. “Environmental Compliance Inspection Report, Sundance Trail Expansion Project (CP09-415)”. Federal Energy Regulatory Commission. 24 September 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.