Leach XPress is a natural gas pipeline reversal. Construction began in 2017.[1]

Leach XPress
Also calledLXP, Leach XPress Project, Leach Express
General information
Project typeReversal[5]
StatusIn service[5]
CommodityNatural gas[5]
OperatorColumbia Gas Transmission (TransCanada)[6] or Columbia Gas Transmission, LLC[6][sources disagree]
Owner and operator
StatesWV, PA, OH[7] or KY, OH, PA, WV[5][sources disagree]
Approved19 January 2017[7]
Construction started2017
In serviceJanuary 2018[5] or 1 January 2018[8][sources disagree]
FERC docketsCP15-514[7], CP20-12[6]
FERC pre-filing docketPF14-23[7]
Contractors
Technical information
Length160 mi[5][8] or 160.7 mi[7][sources disagree]
Pipe size36"[5]
Capacity1530 MMcf/d (FERC project list)[5][7]
Cost$1400 million (EIA estimate; no dollar year given)[5] or approximately US$1.6 billion[8][sources disagree]
On ProvenHand
Hands listed0

Leach XPress is a natural gas pipeline reversal. Construction began in 2017.[1]

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Associated Pipe Line Contractors[4]44.3 miles of 36-inch in Noble, Muskingum, Morgan and Perry counties, OH
Price Gregory International[4]28 miles of 36-inch in Monroe and Noble counties, OH
Associated Pipe Line Contractors, Inc.[9]PrimeTwo Ohio spreads of 36-inch for Columbia Pipeline/TransCanada: 44.4 miles pre-jobbed at Lancaster, OH and 44.3 miles pre-jobbed at Malta, OH (approx. completion Oct 2017)from 1 January 2017
Price Gregory International, LLC[10]PrimeSpreads 2A (27.6 miles), 2B (18 miles) and 5 BM-111 (2.5 miles), all 36-inch, Ohio and West Virginia1 February 2017 – 30 June 2018
Associated Pipe Line Contractors, Inc.[11]Clearing and reclamationClean-up and slip repair on four spreads in Ohio and West Virginia, 2019from 1 January 2019
Beeghly Tree, LLC[12]Clearing and reclamationUnder Price Gregory International, LLCBelmont County, OH: slide repairs, restoration and environmental work at directed locations
Welded Construction, L.P.[13]PrimeListed 2017 as contractor: 25 miles of 36-inch in Marshall County, WV and Greene County, PA
Price Gregory International, LLC[10]PrimeSpread 2A
Price Gregory International, LLC[10]PrimeSpread 2B

Spreads

SpreadPrime contractorDates
Spread 2A[10]Price Gregory International, LLC1 February 2017 – 30 November 2017
Spread 2B[10]Price Gregory International, LLC1 February 2017 – 30 June 2018
Spread 5 (BM-111)[10]Price Gregory International, LLC1 February 2017 – 31 October 2017

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $1400 million (EIA estimate; no dollar year given)[5]
  • approximately US$1.6 billion[8]
In service
  • January 2018[5]
  • 1 January 2018[8]
Length
Operator
  • Columbia Gas Transmission (TransCanada)[6]
  • Columbia Gas Transmission, LLC[6]
States
  • WV, PA, OH[7]
  • KY, OH, PA, WV[5]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Leach XPress? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. sec.gov · exhibit991lxpservicemxpgxp.htm
  2. ferc.gov · FEIS_0.pdf
  3. wvmetronews.com
  4. s3.amazonaws.com · Ongoing_Projects.pdf
  5. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  6. “FERC eLibrary docket CP20-12”. Federal Energy Regulatory Commission. 6 November 2019. Retrieved 3 October 2026.
  7. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  8. “Leach XPress Project Placed into Service; Mountaineer XPress, GulfXPress Receive FERC Certificates (TransCanada news release)”. TransCanada Corporation (SEC Form 6-K, Exhibit 99.1). 2 January 2018. Retrieved 4 October 2026.
  9. “Blue Light Reports, May 2017 (pre-jobs)”. Pipeliners Local Union 798. May 2017. Retrieved 6 October 2026.
  10. “Price Gregory Completed Projects - Five Years (2020 list)”. Price Gregory International, LLC. June 2020. Retrieved 3 October 2026.
  11. “APLC Safety Newsletter, Issue 14, October 2019”. Associated Pipe Line Contractors, Inc. October 2019. Retrieved 6 October 2026.
  12. “Beeghly Tree Recent Notable Projects”. Beeghly Tree, LLC. Retrieved 3 October 2026.
  13. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.