B-System Project

From the ProvenHand pipeline wiki

B-System Project is a pipeline project in Ohio, operated by Columbia Pipeline Group. It entered service in 2018. It runs 20.8 miles of 20" pipe.

B-System Project
General information
KindPipeline project[1]
StatusIn service[2]
Operators
Owner
StateOhio[1]
CountiesFairfield, Franklin[1]
Approved20 November 2017[4]
In serviceOctober 2018[2]
FERC docketCP16-498[3]
Contractors
Technical information
Length20.8 mi[1]
Pipe size20"[1]
On ProvenHand
Hands listed0

B-System Project is a pipeline project in Ohio, operated by Columbia Pipeline Group. It entered service in 2018. It runs 20.8 miles of 20" pipe.

Contractorsedit

ContractorWorkScope
Price Gregory International, LLC[1][5][6]PrimeListed 2018-2019 as contractor: 20.8 miles of 20-inch in Fairfield and Franklin counties, OH

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on B-System Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
  2. “Line K-270 notice of commencement of service and affirmative statement, B System Project (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 31 October 2018. Retrieved 4 October 2026.
  3. “Notice of availability of the environmental assessment for the proposed B-System Project (Docket CP16-498-000), Federal Register 2017-05-05”. Federal Energy Regulatory Commission (Federal Register notice). 5 May 2017. Retrieved 4 October 2026.
  4. “Order approving abandonment and issuing certificate, Columbia Gas Transmission, LLC (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 20 November 2017. Retrieved 4 October 2026.
  5. “Ongoing Projects: Construction Underway (Pipeline News, March 2019)”. Pipeline News. March 2019. Retrieved 3 October 2026.
  6. “Supplemental Information Response to Environmental Conditions Including Implementation Plan, B-System Project (CP16-498)”. Columbia Gas Transmission, LLC (filed with FERC). 5 January 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.