B-System Project
From the ProvenHand pipeline wiki
B-System Project is a pipeline project in Ohio, operated by Columbia Pipeline Group. It entered service in 2018. It runs 20.8 miles of 20" pipe.
| B-System Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Operators | |
| Owner | |
| State | Ohio[1] |
| Counties | Fairfield, Franklin[1] |
| Approved | 20 November 2017[4] |
| In service | October 2018[2] |
| FERC docket | CP16-498[3] |
| Contractors | |
| Technical information | |
| Length | 20.8 mi[1] |
| Pipe size | 20"[1] |
| On ProvenHand | |
| Hands listed | 0 |
B-System Project is a pipeline project in Ohio, operated by Columbia Pipeline Group. It entered service in 2018. It runs 20.8 miles of 20" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Price Gregory International, LLC[1][5][6] | Prime | Listed 2018-2019 as contractor: 20.8 miles of 20-inch in Fairfield and Franklin counties, OH |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on B-System Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
- “Line K-270 notice of commencement of service and affirmative statement, B System Project (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 31 October 2018. Retrieved 4 October 2026.
- “Notice of availability of the environmental assessment for the proposed B-System Project (Docket CP16-498-000), Federal Register 2017-05-05”. Federal Energy Regulatory Commission (Federal Register notice). 5 May 2017. Retrieved 4 October 2026.
- “Order approving abandonment and issuing certificate, Columbia Gas Transmission, LLC (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 20 November 2017. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2019)”. Pipeline News. March 2019. Retrieved 3 October 2026.
- “Supplemental Information Response to Environmental Conditions Including Implementation Plan, B-System Project (CP16-498)”. Columbia Gas Transmission, LLC (filed with FERC). 5 January 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.