Transco Mid-South Expansion Phase 1 is a natural gas pipeline expansion in Alabama, Georgia, North Carolina and South Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2012. It runs 22.6 miles of 42" pipe.

Transco Mid-South Expansion Phase 1
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StatesAlabama, Georgia, North Carolina, South Carolina[1]
Approved25 August 2011[2]
In service15 May 2012[1]
FERC docketCP11-18[1]
FERC pre-filing docketPF10-13[1]
Technical information
Length22.6 mi[1]
Pipe size42"[1]
Capacity95 MMcf/d additional capacity (EIA)[1]
Cost$92.5 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Transco Mid-South Expansion Phase 1 is a natural gas pipeline expansion in Alabama, Georgia, North Carolina and South Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2012. It runs 22.6 miles of 42" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco Mid-South Expansion Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order issuing certificate(s), docket CP11-18: Order Issuing Certificate re Transcontinental Gas Pipe Line Company, LLC under CP11-18.”. Federal Energy Regulatory Commission. 25 August 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.