Transco Mid-South Expansion Phase 2
From the ProvenHand pipeline wiki
Transco Mid-South Expansion Phase 2 is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2013. It runs 23 miles.
| Transco Mid-South Expansion Phase 2 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Alabama[1] |
| Approved | 25 August 2011[2] |
| In service | 3 June 2013[1] |
| FERC docket | CP11-18[1] |
| FERC pre-filing docket | PF10-13[1] |
| Technical information | |
| Length | 23 mi[1] |
| Capacity | 130 MMcf/d additional capacity (EIA)[1] |
| Cost | $126.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Transco Mid-South Expansion Phase 2 is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2013. It runs 23 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Transco Mid-South Expansion Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP11-18: Order Issuing Certificate re Transcontinental Gas Pipe Line Company, LLC under CP11-18.”. Federal Energy Regulatory Commission. 25 August 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.