Transco Mobile Bay Lat Expansion I

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Transco Mobile Bay Lat Expansion I is a natural gas pipeline expansion in Alabama, operated by ANR Pipeline Company. It entered service in 1998.

Transco Mobile Bay Lat Expansion I
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateAlabama[1][2]
Approved2 February 1998[1]
In serviceAugust 1998[2]
FERC docketCP97-92[1]
Technical information
Length76.8 mi[1] or 76 mi[2][sources disagree]
Pipe size24"[2]
Capacity600 MMcf/d (FERC project list)[1] or 350 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$120.2 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Transco Mobile Bay Lat Expansion I is a natural gas pipeline expansion in Alabama, operated by ANR Pipeline Company. It entered service in 1998.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 600 MMcf/d (FERC project list)[1]
  • 350 MMcf/d additional capacity (EIA)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco Mobile Bay Lat Expansion I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.