Transco Southeastern Trail Expansion
From the ProvenHand pipeline wiki
This is an old revision of this page, as edited by ProvenHand at 17:10, 3 October 2026 (Imported from public sources (FERC, EIA, operators, contractors, trade press)). It may differ significantly from the current version.
Transco Southeastern Trail Expansion is a natural gas pipeline in Virginia, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]
| Transco Southeastern Trail Expansion | |
|---|---|
| Also called | Southeastern Trail, Southeastern Trail Expansion Project, Manassas Loop |
| General information | |
| Commodity | Natural gas |
| Operator | Williams (Transco) |
| State | Virginia |
| Construction started | 2020 |
| In service | 2021 |
| Technical information | |
| Length | 7.7 mi |
| Pipe size | 42" |
| On ProvenHand | |
| Hands listed | 0 |
Transco Southeastern Trail Expansion is a natural gas pipeline in Virginia, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]
Referencesedit
- ferc.gov · 10-2019-C-2.pdf
- williams.com
- princewilliamtimes.com · article_de44c3b7-a03c-5642-b031-f68302a8
- eia.gov · EIA-NaturalGasPipelineProjects.xlsx
This pipeline article is a stub. You can help ProvenHand by expanding it.