Transco Southeastern Trail Expansion

From the ProvenHand pipeline wiki

This is an old revision of this page, as edited by ProvenHand at 17:10, 3 October 2026 (Imported from public sources (FERC, EIA, operators, contractors, trade press)). It may differ significantly from the current version.

Transco Southeastern Trail Expansion is a natural gas pipeline in Virginia, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]

Transco Southeastern Trail Expansion
Also calledSoutheastern Trail, Southeastern Trail Expansion Project, Manassas Loop
General information
CommodityNatural gas
OperatorWilliams (Transco)
StateVirginia
Construction started2020
In service2021
Technical information
Length7.7 mi
Pipe size42"
On ProvenHand
Hands listed0

Transco Southeastern Trail Expansion is a natural gas pipeline in Virginia, operated by Williams (Transco). Construction began in 2020 and the line entered service in 2021. It runs 7.7 miles of 42" pipe.[1]

Referencesedit

  1. ferc.gov · 10-2019-C-2.pdf
  2. williams.com
  3. princewilliamtimes.com · article_de44c3b7-a03c-5642-b031-f68302a8
  4. eia.gov · EIA-NaturalGasPipelineProjects.xlsx

This pipeline article is a stub. You can help ProvenHand by expanding it.