TransColorado Expansion

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

TransColorado Expansion is a natural gas pipeline expansion, operated by TransColorado Gas Transmission Co.. It entered service in 2004. It runs 0.1 miles of 22" pipe.

TransColorado Expansion
Also calledTransColorado 2004 Expansion[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateCO[1] or CO, NM[2][sources disagree]
Approved24 March 2004[1]
In serviceSeptember 2004[2]
FERC docketCP04-12[1]
Technical information
Length0.1 mi[1]
Pipe size22"[2]
Capacity125 MMcf/d (FERC project list)[1][2]
Cost$33 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

TransColorado Expansion is a natural gas pipeline expansion, operated by TransColorado Gas Transmission Co.. It entered service in 2004. It runs 0.1 miles of 22" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TransColorado Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.