TransColorado Gas Transmission North Expansion Project

From the ProvenHand pipeline wiki

TransColorado Gas Transmission North Expansion Project is a natural gas pipeline expansion in Colorado, operated by TransColorado Gas Transmission Co.. It entered service in 2006. It runs 0.4 miles of 12", 24" pipe.

TransColorado Gas Transmission North Expansion Project
Also calledTransColorado North Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][3]
StatusIn service[1][4]
CommodityNatural gas[1]
Owner and operator
StateColorado[1][2]
Approved27 May 2005[2][5]
In serviceJanuary 2006[1]
FERC docketCP05-45[2]
Technical information
Length0.4 mi[2]
Pipe size12", 24"[1]
Capacity300 MMcf/d (FERC project list)[1][2]
Cost$16.3 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

TransColorado Gas Transmission North Expansion Project is a natural gas pipeline expansion in Colorado, operated by TransColorado Gas Transmission Co.. It entered service in 2006. It runs 0.4 miles of 12", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TransColorado Gas Transmission North Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP05-45”. Federal Energy Regulatory Commission. 6 January 2005. Retrieved 3 October 2026.
  4. “TransColorado construction noise survey filed after placing the Greasewood Compressor Station in service (CP05-45)”. TransColorado Gas Transmission Company (filed with FERC). 16 May 2006. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, TransColorado Gas Transmission Company (CP05-45)”. FERC. 27 May 2005. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.