TransColorado Pipeline (Northern)

From the ProvenHand pipeline wiki

TransColorado Pipeline (Northern) is a natural gas pipeline expansion in Colorado. It entered service in 1999. It runs 266 miles of 22" pipe.

TransColorado Pipeline (Northern)
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
StateColorado[1]
In service15 February 1999[1]
FERC docketCP90-1777[1]
Contractors
Technical information
Length266 mi[1]
Pipe size22"[1]
Capacity300 MMcf/d additional capacity (EIA)[1]
Cost$240 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

TransColorado Pipeline (Northern) is a natural gas pipeline expansion in Colorado. It entered service in 1999. It runs 266 miles of 22" pipe.

Contractorsedit

ContractorWorkScopeSpreadYears
Associated Pipe Line Contractors, Inc.[2]PrimeTransColorado Spread 3: 80.1 miles of 22-inch pipeline, built within permit conditions including environmental and wildlife construction windowsSpread 31 July 1998 – 1 December 1998

Spreads

SpreadPrime contractor
Spread 3[2]Associated Pipe Line Contractors, Inc.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TransColorado Pipeline (Northern)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2004-10-13)”. Associated Pipe Line Contractors, Inc. Archived from the original on 13 October 2004. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.