Transcontinental Gas Pipe Line 85 North Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Transcontinental Gas Pipe Line 85 North Expansion Project is a natural gas pipeline, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2009 and the line entered service in 2011. It runs 22 miles of 42" pipe.

Transcontinental Gas Pipe Line 85 North Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[2] or Loop[3][sources disagree]
StatusIn service[4]
CommodityNatural gas[3]
Owner and operator
Facility projects
StatesAL, GA[1] or AL, GA, NC, SC[3][sources disagree]
CountiesAlabama: Chilton, Coosa
Georgia: Walton

North Carolina: Iredell, Rowan

South Carolina: Anderson, Cherokee, Spartanburg
[3]
Approved3 September 2009[1]
Construction startedSeptember 2009[8]
In service1 May 2011[9]
FERC docketCP09-57[1]
FERC pre-filing docketPF08-21[2]
Technical information
Length22 mi[1]
Pipe size42"[3]
Capacity308.5 MMcf/d (FERC project list)[1]
On ProvenHand
Hands listed0

Transcontinental Gas Pipe Line 85 North Expansion Project is a natural gas pipeline, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2009 and the line entered service in 2011. It runs 22 miles of 42" pipe.

Spreads

Spread
Coosa Loop[3]
Cowpens Loop[3]
Iredell Loop[3]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transcontinental Gas Pipe Line 85 North Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP09-57”. Federal Energy Regulatory Commission. 30 January 2009. Retrieved 3 October 2026.
  3. “Order issuing certificate(s), docket CP09-57: Order granting abandonment authority and issuing certificate re Transcontinental Gas Pipel”. Federal Energy Regulatory Commission. 3 September 2009. Retrieved 4 October 2026.
  4. “Quarterly Construction Progress Report, June 1 - September 1, 2011, 85 North Expansion Project (CP09-57)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 8 September 2011. Retrieved 4 October 2026.
  5. “Letter order granting Transcontinental Gas Pipe Line Company, LLC's request to commence construction of Compressor Station 135, 85 North Expansion Project (CP09-57)”. Federal Energy Regulatory Commission. 7 April 2010. Retrieved 4 October 2026.
  6. “Transco request to place into service the 85 North Expansion Project Phase 2 facilities (CP09-57)”. Transcontinental Gas Pipe Line Company, LLC (FERC eLibrary). 6 April 2011. Retrieved 4 October 2026.
  7. “Transco request to place into service the 85 North Expansion Project Phase 1 facilities (CP09-57)”. Transcontinental Gas Pipe Line Company, LLC (FERC eLibrary). 16 June 2010. Retrieved 4 October 2026.
  8. “Bi-weekly Construction Progress Report, September 17 - October 2, 2009, 85 North Expansion Project (CP09-57)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 5 October 2009. Retrieved 4 October 2026.
  9. “Notification of Placement into Service, 85 North Expansion Project Phase 2 Facilities (CP09-57)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 4 May 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.