Cheniere Creole Trail LNG Interconnect
From the ProvenHand pipeline wiki
Cheniere Creole Trail LNG Interconnect is a natural gas pipeline in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC.
| Cheniere Creole Trail LNG Interconnect | |
|---|---|
| General information | |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Louisiana[1] |
| Counties | Beauregard[1] |
| FERC docket | CP08-40[2] |
| Contractors | |
| Technical information | |
| Capacity | up to 1 billion cubic feet per day of revaporized LNG[1] |
| On ProvenHand | |
| Hands listed | 0 |
Cheniere Creole Trail LNG Interconnect is a natural gas pipeline in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC.
Contractorsedit
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cheniere Creole Trail LNG Interconnect? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report re Transcontinental Gas Pipe Line Corp (CP08-40)”. FERC. 28 January 2008. Retrieved 4 October 2026.
- “FERC eLibrary docket CP08-40”. Federal Energy Regulatory Commission. 18 December 2007. Retrieved 3 October 2026.
- “Weekly Construction Progress Report, Cheniere Creole Trail LNG Interconnect, March 31 to April 5, 2008 (CP08-40)”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 9 April 2008. Retrieved 4 October 2026.