Transcontinental Gas Pipe Line CP08-421
From the ProvenHand pipeline wiki
Transcontinental Gas Pipe Line CP08-421 is a pipeline project, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2008.
| Transcontinental Gas Pipe Line CP08-421 | |
|---|---|
| General information | |
| Owner and operator | |
| Counties | Calcasieu[2] |
| Construction started | October 2008[3] |
| FERC docket | CP08-421[1] |
| Technical information | |
| Cost | approximately $8.8 million (Transco estimate; reimbursed by Golden Pass)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Transcontinental Gas Pipe Line CP08-421 is a pipeline project, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2008.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Transcontinental Gas Pipe Line CP08-421? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-421”. Federal Energy Regulatory Commission. 13 June 2008. Retrieved 3 October 2026.
- “Transcontinental Gas Pipe Line Corporation; Notice of Request Under Blanket Authorization (Docket No. CP08-421-000), Federal Register E8-14455”. Federal Energy Regulatory Commission (published in the Federal Register). 26 June 2008. Retrieved 4 October 2026.
- “Weekly Construction Progress Report for October 28 to November 2, 2008, Golden Pass Interconnect, Transcontinental Gas Pipe Line Corporation (CP08-421)”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 3 November 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.