Transcontinental Gas Pipe Line CP08-58

From the ProvenHand pipeline wiki

Transcontinental Gas Pipe Line CP08-58 is a natural gas pipeline replacement in Maryland, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2008. It runs 1.1 miles of 30", 36" pipe.

Transcontinental Gas Pipe Line CP08-58
Also calledMD-11 Project[1]
General information
KindPipeline project[2]
Project typeReplacement[2][3]
CommodityNatural gas[4]
Owner and operator
StateMaryland[4]
CountiesHoward[3][4]
Construction startedJune 2008[1]
FERC docketCP08-58[2]
Contractors
Technical information
Length1.1 mi[5]
Pipe size30", 36"[5]
Costapproximately $9.6 million[3][4]
On ProvenHand
Hands listed0

Transcontinental Gas Pipe Line CP08-58 is a natural gas pipeline replacement in Maryland, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2008. It runs 1.1 miles of 30", 36" pipe.

Contractorsedit

ContractorWorkScope
Welded Construction, L.P.[1]PrimeContractor for the replacement of the three Howard County, Maryland mainline segments (weekly reports June to October 2008)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transcontinental Gas Pipe Line CP08-58? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Weekly Construction Progress Report, MD-11 Project (June 16-20, 2008), Transcontinental Gas Pipe Line Corporation (CP08-58)”. Transcontinental Gas Pipe Line Corporation (filed with FERC). 27 June 2008. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP08-58”. Federal Energy Regulatory Commission. 18 January 2008. Retrieved 3 October 2026.
  3. “Transcontinental Gas Pipe Line Corporation; Prior Notice of Activity Under Blanket Certificate (Docket No. CP08-58-000), Federal Register E8-1625”. Federal Energy Regulatory Commission (published in the Federal Register). 30 January 2008. Retrieved 4 October 2026.
  4. “Prior notice of activity under blanket certificate, Transcontinental Gas Pipe Line Corporation (CP08-58)”. FERC. 24 January 2008. Retrieved 4 October 2026.
  5. “Environmental Comments, Transcontinental Gas Pipe Line Corporation mainline replacement in Howard County, Maryland (CP08-58)”. FERC. 20 March 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.