Transcontinental Gas Pipe Line CP11-119

From the ProvenHand pipeline wiki

Transcontinental Gas Pipe Line CP11-119 is a natural gas pipeline replacement in Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. It runs 3.7 miles of 30", 36" pipe.

Transcontinental Gas Pipe Line CP11-119
General information
KindPipeline project[1]
Project typeReplacement[1][2]
CommodityNatural gas[2]
Owner and operator
StateGeorgia[2]
CountiesOconee[2]
FERC docketCP11-119[1]
Technical information
Length3.7 mi[2]
Pipe size30", 36"[2]
Cost$15,200,000[2]
On ProvenHand
Hands listed0

Transcontinental Gas Pipe Line CP11-119 is a natural gas pipeline replacement in Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. It runs 3.7 miles of 30", 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transcontinental Gas Pipe Line CP11-119? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP11-119”. Federal Energy Regulatory Commission. 4 March 2011. Retrieved 3 October 2026.
  2. “Advance notification under 18 CFR 2.55(b), U.S. Department of Transportation pipeline replacement, Oconee County, Georgia (CP11-119)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 4 March 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.